s'r\ COl.U4,. ~\ ~ BRITISH COLUMBIA Q ~ ; ), .a ~ = )7 UTILITIES COMMISSION s J. .• -~~ ~ ,-~'f~~ .....: "~ Gj </~ ,C:::J / 12 8 COt-/l~ ORDER NUMBER -C-S-82 PROVINCE OF BRITISH COLUMBIA BRITISH COLUMBIA UTILITIES COMMISSION IN THE MATTER OF the Utilities Commission Act, S.B.C. 1980, c. 60, as amended and IN THE MATTER OF an Application by Hemlock Valley Electrical Services Ltd. BEFORE: M. Taylor, ) Chairman; and ) D.B. Kilpatrick, ) September 1, 1982 Commissioner ) CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY WHEREAS Hemlock Valley Electrical Services Ltd. ("Hemlock") applied August 12, 1982 for a Certificate of Public Convenience and Necessity authorizing the construction and ownership of a 4.8 mile electric power pole line from Morris Valley Road for the purpose of providing an interconnect of Hemlock's electrical distribution system with the facilities of British Columbia Hydro and Power Authority ("B.C. Hydro") permitting supply of basic electric power therefrom; and WHEREAS the Commission has considered the material provided by Hemlock in support of its proposal, including the fixed-price construction tender submitted by Pacific Electrical Installations Ltd. in the amount of $224,691; and ... /2 n\E'JTY ",R5T FLOOR 1177 WEST HASTINGS STREET. VANCOUVER B VEE 2L7 CA'JADA TELEPHONE 16041 689-1831 TELEX 04-54536
WHEREAS the Commission concludes that the interconnect project is necessary for the public convenience and properly conserves the public interest. NOW THEREFORE the Commission hereby orders Hemlock Valley Electrical Services Ltd. as follows: 1. Construction of the project is to commence immediately, with interconnection to B.C. Hydro facilities anticipated not later than December 1, 1982. 2. Appropriate reductions in the Tariff Rate Schedules of Hemlock will be prepared and submitted for Commission approval in a timely manner in contemplation of a December 1, 1982 effective date. DATED at the City of Vancouver, in the Province of British Columbia, this /o~ day of September, 1982. BRITISH COLUMBIA UTILITIES COMMISSION ORDER NUMBER C _ -S _ -8 _ 2 __. .1 2 j;~k> Chairman
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.