Orders

Decision Information

Decision Content

ROBERT J. PELLATT COMMISSION SECRETARY Commission.Secretary@bcuc.com web site: http://www.bcuc.com VIA FACSIMILE / E-MAIL Mr. Richard Stout Chief Regulatory Officer British Columbia Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Facsimile: 604-623-4407 Dear Mr. Stout and Mr. Lusztig: Re: British Columbia Hydro and Power Authority Project No. 3698360 Order No. G-84-03 2004/05 and 2005/06 Revenue Requirements Application and British Columbia Transmission Corporation Application for Deferral Accounts By letter dated April 15, 2004 BC Hydro requested alternate hearing hours for May 20, 2004 of 8:15 a.m. to 10:00 a.m. and 12:30 p.m. to 4:30 p.m. to accommodate the availability of its opening panel. The Commission Panel accepts the request and the hearing hours for May 20, 2004 will be adjusted accordingly. for: cc: Registered Intervenors BCH/2004-06RR/Hrg Hours May 20 L-26-04 LETTER NO. L-26-04 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. CANADA V6Z 2N3 TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 Log No. 6057 April 22, 2004 Mr. Cameron Lusztig Director, Regulatory Affairs British Columbia Transmission Corporation Suite 1100, Four Bentall Centre 1055 Dunsmuir Street PO Box 49260 Vancouver, BC V7X 1V5 Facsimile: 604-699-7537 Yours truly, Original signed by: Constance M. Smith Robert J. Pellatt
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.