Orders

Decision Information

Decision Content

                        BRIT ISH  COLU   MBIA         UTIL IT IES  COM   MISSION                     ORDER         NUMBER   G ‐15808                    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102      IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by the British Columbia Hydro and Power Authority  for Approval to RePrice Net Metering Services      BEFORE L.FKelseyCommissioner    P.EVivianCommissioner  October 232008    A.ARhodesCommissioner    O  R  D  E  R  WHEREAS   A British Columbia Hydro and Power Authority (“BC Hydro”) filed an Application (the “Application”) dated  October 32008with the British Columbia Utilities Commission (the “Commission”), pursuant to sections 58  to 61 of the Utilities Commission Act (“UCA”), for approval to increase the Rate Schedule 1289 ‐ Net  Metering Service (“RS 1289”) energy priceand    B RS 1289 was originally approved by Commission Order G2604 on March 102004.  RS 1289 is available  upon Applicationto customers taking service from BC Hydro who install a generating facilitywith a  nameplate rating of not more than 50 kW and which can be defined as producing “B.CClean Electricity”, to  serve their electricity requirementsand    C Customers who generate more energy than they consumereceive a credit from BC Hydro valued at the rate  applicable to their electricity service accountwhich is applied against future consumption charges.  At each  annual anniversary dateif there is any excess energy remaining in the customer's accountBC Hydro credits  the customer for that energycurrently at 5.40 cents/kWhand    D BC Hydro notes that the Application is consistent with Policy Action No11 of the 2007 B.CEnergy Plan which intends that the price paid for net annual surpluses of generation purchased by BC Hydro be generally  consistent with the prices paid under BC Hydro's Standing Offer Program (“SOP”); and    E BC Hydro proposes to increase the RS 1289 energy price from 5.40 cents/kWh to 8.16 cents/kWh.  The  proposed price of 8.16 cents is the 2006 SOP levelised base price of 7.84 centsadjusted for inflationand    F. BC Hydro proposes that the Application be reviewed by a written hearing process   …/2 
        BRIT ISH  COLUMBIA     UTIL IT IES  COMMISSION               ORDER      NUMBER   G15808      2        NOW THEREFORE the Commission orders as follows   1 The Application will be reviewed by a written hearing process.  The Regulatory Timetable will be as described  in Appendix “A” to this Order   2 The process will include one round of Information Requests from the Commission and written submissions  from Registered Intervenors   3 BC Hydro is to provide a copy of the Applicationand this Commission Order and Regulatory Timetableto all  current RS 1289 customers and to those who were Intervenors in the 2003 RS 1289 proceeding   4 Those wishing to participate in BC Hydros Net Metering RePricing Application are to advise the Commission  Secretary of their intention to do soin writing no later than FridayNovember 72008     DATED at the City of Vancouverin the Province of British Columbiathis             29 th             day of October 2008     BY ORDER      Original signed by     L.FKelsey    Commissioner  Attachment    Orders/G15808_BCHNet Metering Wrtn Hrg 
  British Columbia Hydro and Power Authority  An Application for Approval to RePrice Net Metering Services       REGULATORY TIMETABLE      ACTION     Commission Information Request to BC Hydro  Registration Deadline for Intervenors and Interested Parties  BC Hydro Response to Commission Information Request  Intervenor Written Submissions  BC Hydro Final Submission    APPENDIX A  to Order G15808  Page 1 of 1            DATES   ThursdayNovember 62008 FridayNovember 72008 ThursdayNovember 202008 ThursdayNovember 272008 FridayDecember 52008  
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.