                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com  IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by British Columbia Hydro and Power Authority  for Review of the F2009 and F2010 Revenue Requirements Application    BEFORE L.A OHaraPanel Chair    BMilbourneCommissioner    ARhodesCommissioner    O  R  D  E  R  WHEREAS   A. British Columbia Hydro and Power Authority (“BC Hydro”) filed on February 202008pursuant to  sections 58 to 61 of the Utilities Commission Act (“the Act”), its F2009 and F2010 Revenue Requirements  application foramong other thingsapproval of acrosstheboard rate increases of 6.56 percent and 8.21  percenteffective April 12008 and April 12009respectivelyand approval of a reduction of the Deferral  Account Rate Rider from 2.0 percent to 0.5 percenteffective April 12008 (the “F09/F10 RRA” or  Application”); and    B. The Application also sought refundable interim relief pursuant to sections 58 to 61 and section 90 of the Act  to allow BC Hydro to increase its rates by 6.56 percent on an acrosstheboard basis and to decrease its  Deferral Account Rate Rider from 2.0 percent to 0.5 percentboth effective April 12008pending a full  hearing into the F09/F10 RRA and orders subsequent to that hearingon the basis that on April 12008  BC Hydros current rates would otherwise no longer be fairjustsufficient and not unduly discriminatory and    C. On February 222008 the Commission issued Letter L508 that included establishing the regulatory process  and timetable for the F09/F10 RRA and the Transmission Service Rate Repricing Application (“TSR Repricing  Application”) and for parties to addressby written submissionthe BC Hydro request to implement interim  rates effective April 12008and     D. On February 252008 the Commission issued Order G2108 establishing the Regulatory Timetable for the  F09/F10 RRA.  The Regulatory Timetable included a Workshop on March 62008Commission and  Intervenor Information RequestsResponses by BC Hydroand a Procedural Conference on April 282008.   The Procedural Conference was to consider further process for the F09/F10 RRATSR Repricing Application and Residential Inclining Block (“RIB”) Applicationand              BRIT ISH  COLU   MBIA   UTIL IT IES  COM   MISSION               ORDER         NUMBER   G  11908            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    August 152008  …/2 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G11908  2  E. On February 282008 the Commission issued Order G2808 that included a Notice of Applicationsand    F. On March 142008 the Commission issued Order G4008 that approved interim refundable rate changes for  the 6.56 percent acrosstheboard rate increase and the decrease in BC Hydros Deferral Account Rate Rider  from 2.0 percent to 0.5 percentboth effective April 12008and    G. At the April 282008 Procedural Conference BC Hydro presented a “Strawman Regulatory Timetable” that  coordinated the three applications.  For the F09/F10 RRABC Hydro proposed a regulatory timetable that  included a Negotiated Settlement Process (“NSP”).  BC Hydro also proposed an Oral Public Hearing  commencing on MondayOctober 62008 for issues not resolved in the NSP.  BC Hydro also proposed a Pre hearing Conference one week before the commencement of the Oral Public Hearingand    H. At the Procedural Conference BC Hydro proposed that all issues arising from the F09/F10 RRAexcept for  Demand Side Management (“DSM”) issuesshould be included within the scope of the NSP.  BC Hydro was of  the view that DSM expenditures during the test period are more appropriately addressed in the context of  the LongTerm Acquisition Plan (“LTAP”) proceedingand that the anticipated demand response to those  expenditures should also be resolved in the LTAP proceeding.  In additionBC Hydro was of the view that the  appropriate amortization period for DSM expenditures are also more appropriately addressed in the context  of the LTAP proceedingand    I. All the Intervenors in attendance were supportive of or did not take a position on the BC Hydro proposed  regulatory timetable for the F09/F10 RRA except for the City of New Westminsterand    J. The Commission considered the submissions received at the Procedural Conference and by Order G7808  established a Regulatory Timetable for the review of F09/F10 RRA through an NSP that was to commence on  MondayAugust 182008.  The Order also established that in the event the NSP does not conclude with an  agreement on all issues within the scope of the NSPthen a Prehearing Conference will commence on  MondaySeptember 292008 at 9:00 a.mand an Oral Public Hearing will commence on MondayOctober 6 2008 at 9:00 a.m.; and    K. On July 22008 BC Hydro filed an Evidentiary Update to the RRA that included F2008 actual results and  F2008 closing balances of all regulatory and deferral accountsan update on the DSM energy savings and  expenditures to be consistent with forecasts in BC Hydros 2008 LTAPas well as updated forecasts for  energy salesrevenues and cost of energy.   If all these changes are approved the final rates for F2009 and  F2010 would be annualized rate increases of approximately 9 percent per year.  BC Hydro proposes  deferring forecast increases on those costs that are subject to deferral but flowing through into rates the  forecast net reduction in those costs not subject to deferral.  Based on this approach BC Hydro proposes  final rate increases of 5.96 percent and 8.12 percent effective April 12008 and 2009 respectivelyand  …/3 
  BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G11908  3 L. On July 302008 MrStuart Meade issued a late information request to BC Hydro.  The Regulatory Timetable  attached to Order G7808 established the Information Request No2 deadline of May 212008.  On August  12008 the Commission advised BC Hydro that it may provide a response to the late information request  before the commencement of the NSP discussions if time and resources permit.  On August 12008 BC  Hydro in its letter to the Commission indicated that the late information request with 82 questions were  beyond reasonable for BC Hydro to be flexible and responsive.  HoweverBC Hydro indicated that it would  be prepared to answer MrMeades questions through the oral hearing should the NSP beginning on  August 182008 not be successful.  On August 62008 BC Hydro wrote to MrMeade that it is unable to  respond to his information request prior to August 182008and    M. On August 132008the Canadian Office and Professional Employees Union (“COPE”) filed a request for  leave to submit evidence for the negotiated settlement/hearing since the Intervenor Evidence deadline of  July 292008 established by Order G7808 had passed.  COPE in its request included a summary of its  evidence.  On August 132008BC Hydro objected to the late filing of the evidence because it will not allow  information requests to be issued on the evidence and responses received prior to the NSP.  BC Hydro noted  that participants to an NSP are free to bring any issues to the table in the NSP regardless of whether  evidence has been filed or not.  Depending on the outcome of the NSPBC Hydro stated that it may not  maintain its objectionand    N. On August 132008the Joint Electricity Steering Committee (“JIESC”) filed a letter stating that it initially  supported the holding of an NSP on the F09/F10 RRA but it no longer does.  The JIESC also noted that in  BC Hydros Evidentiary Update the rate increases are approximately 9 percent per year for F2009 and F2010  to meet BC Hydros revenue requirementand based on BC Hydro material filed in other proceedings there  could be annual increases of a similar magnitude continuing in the future.  In the JIESCs viewBC Hydro has  failed to justify the proposed expenditures and resulting rate increases in spite of all the information filed.   The JIESC considers that the NSP does not have any realistic possibility of success in resolving all or even  some of the significant issues in this proceeding.  The JIESC requests that the Commission cancel the NSP and  proceed to a full public hearing on Monday October 62008 as set out in the Regulatory Timetableand    O. On August 142008 the British Columbia Old Age Pensioners Organization et al. (“BCOAPO”) joined the  JIESCs request to the Commission that the NSP should be cancelled and the matter proceed to an oral public  hearing scheduled for October 62008.  BCOAPO stated that it was reasonably optimistic before the  evidentiary update was filed that an NSP might succeed if BC Hydro was reasonable and responsive to the  concerns and requests of customer groups during negotiation.  After reviewing the evidentiary update BCOAPO states that it reexamined its position and came to same conclusion as the JIESC that there is no  realistic chance of success for an NSPand    P. On August 142008the Rental Owners and Managers Society of BC (“ROMS BC”) concurred with the August  13 and 142008 submissions of the JIESC and BCOAPO respectively.  ROMS BC requests that the NSP be  cancelled and this matter proceed to the scheduled public hearing on October 62008and    …/4 
    BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER     NUMBER   G11908  4      Q. On August 142008 BC Hydro replied to the JIESCs and BCOAPOs letters of August 13 and 142008  respectively.  BC Hydro states that it regrets the additional burden that these positions will create but feels  that without the willing participation of these two intervenors it is not worthwhile to proceed with the NSP.   BC Hydro intends to address the current schedule for the balance of the F09/F10 RRA regulatory process in a  further submission next weekand    R. The Commission has reviewed the submissions and concludes that a determination is required     NOW THEREFORE the Commission orders as follows   1. The NSP Settlement Discussions on the F09/F10 RRA that are scheduled to commence on Monday August 182008 are cancelled.     2. A Prehearing Conference is scheduled for 9:00 a.mon ThursdayAugust 212008 in the Commission  Hearing Room on the Twelfth Floor1125 Howe StreetVancouverB.Cto receive submissions from  Intervenors and BC Hydro on a regulatory timetable and the scope of the issues to be addressed in the  review of the F09/F10 RRA   3. The late information request by MrMeade and the filing of a response to the information request by BC  Hydro will be addressed at the Prehearing Conference   4. The request by COPE to file intervenor evidence and the filing of related information requests and responses  are to be addressed at the Prehearing Conference   5. Any other matters that will provide for an efficient review of the F09/F10 RRA can be addressed at the  Prehearing Conference     DATED at the City of Vancouverin the Province of British Columbiathis               15 th              day of August 2008     BY ORDER      Original signed by     L.AOHara    Panel Chair  ORDERS/G11908_BCHF20092010RR_CancelNSP PreHrg Conference 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.