                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  Applications for Reconsideration of   A Decision approving for FortisBC Inc a Certificate of Public Convenience and Necessity  for the Ellison Substation Project    BEFORE L.FKelseyPanel Chair      O  R  D  E  R  WHEREAS   A On October 272006 FortisBC Inc. (“FortisBC”) applied (the “Application”) to the British Columbia Utilities  Commission (the “Commission”) for a Certificate of Public Convenience and Necessity (“CPCN”) for the  Ellison Substation Project (the “Ellison Substation”); and    B Following a review of the Application that included an oral public hearing on April 22007the Commission  by Order C407 granted FortisBC a CPCN to construct the Ellison Substation Project – Option 1and directed  FortisBC to file a report assessing the Airport site for the substation as an alternative to the proposed  Lochrem Road siteand    C On June 62007 FortisBC submitted its report assessing the Airport siteand    D By Order G7507 dated June 282007the Commission approved the Lochrem Road site for the Ellison  Substationas appliedfor in the Applicationand    E By letter dated September 182008the Concerned Citizens of Quail Ridge and Lochrem Road (“CCQRLR”)  applied for a reconsideration of the Commissions Decision as set out in Orders C0407 and G7507 (the  Decision”); and    F By letter dated September 232008the Quail Ridge Residents Association (“QRRA”) also applied for a  reconsideration of the Decisionand    G In response to the applications of CCQRLR and QRRA for a reconsideration of the Decision (the  Reconsideration Applications”), on October 212008 FortisBC provided executed copies of an Operating  Agreement and Statement of Work Agreement with NAV CANADA (the “Agreements”); and            BRIT ISH  COLU   MBIA   UTIL IT IES  COM   MISSION               ORDER         NUMBER   G  16608            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102        November 182008  …/2 
        BRITISH  COLUMBIA     UTILITIES  COMMISSION               ORDER       NUMBER   G16608        2        H By Letter L5008 dated October 22208the Commission established a written comment process on the  Reconsideration Applications to address the reconsideration phase one issue of whether a reasonable basis  exists to allow a reconsiderationand    I CCQRLRQRRAFortisBCColin BechtelJudy ClaytonRhonie Horneand Bernice and John Fortunat  submitted commentsand    J The Commission has considered the submitted commentsand has determined that a reconsideration of the  Decision should proceed on a limited basis with regard to the initial question of whether the Ellison  Substation as approved at the Lochrem Road sitewill cause problems for the systems at the Kelowna  Airport under the terms specified in the Agreements with NAV CANADA.  The Commissions Reasons for  Decision are attached as Appendix B to this Order      NOW THEREFORE the Commission orders as follows   1 The Commission establishes a written hearing to reconsider the Decisionso as to address the initial  question of whether the Ellison Substationas proposed and approved at the Lochrem Road sitewill cause  problems for the systems at the Kelowna Airport under the terms specified the Agreements andif problems  are causedthe changes that will be needed to remedy the situationand the cost of the changes (the “Initial  Issue”).    2 By MondayDecember 12008FortisBC will file an independent engineering Report (the “Report”) by a  properly qualified individual or group that reviews the siting and design of the Ellison Substation as proposed  and approvedrelative to the requirements of NAV CANADA as set out in the Agreementsand which  confirms that the substation will comply with the requirements.  If this confirmation cannot be providedthe  Report will describe the changes to the substation that are needed to bring it into complianceand the  estimated cost of these changes   3  FortisBC will provide a copy of the Report to Intervenors and Interested Parties in the Ellison Substation  CPCN proceedingparties who participated in the reconsideration phase one comment process and NAV  CANADA (collectively the “Participants”).    4 The Regulatory Timetable for the written process to address the Initial Issue is attached as Appendix A to this  Order   …/3 
                    3        5 Following the completion of the written process for the Initial Issuethe Commission may establish a  reconsideration of other issues related to the Decision     DATED at the City of Vancouverin the Province of British Columbiathis        18                 Attachments    Orders/G16608_FortisBC_Ellison Reconsideration Phase 2   BRITISH  COLUMBIA   UTILITIES  COMMISSION         ORDER     NUMBER   G16608    th             day of November 2008 BY ORDER  Original signed by L.FKelsey  Panel Chair 
  Applications for Reconsideration of   Decisions approving for FortisBC Inc a Certificate of Public Convenience and Necessity  for the Ellison Substation Project      REGULATORY TIMETABLE        ITEM  Filing of Independent Engineering Report  Information Requests to FortisBC  FortisBC Responses to Information Request  Participants File Written Evidence  Information Requests on Participant Written Evidence  Response to Information Requests    CCQRLR and QRRA Final Submissions  FortisBC and other Participants Final Submissions  CCQRLR and QRRA Reply Submissions           APPENDIX A  to Order G16608  Page 1 of 1      DATE (2008) MondayDecember 1 ThursdayDecember 4 WednesdayDecember 10 MondayDecember 15 ThursdayDecember 18 WednesdayDecember 24 DATE (2009) MondayJanuary 5 FridayJanuary 9 WednesdayJanuary 14
APPENDIX B to Order G-166-08 Page 1 of 4      Applications for Reconsideration of   Decisions approving for FortisBC Inc a Certificate of Public Convenience and Necessity  for the Ellison Substation Project      REASONS FOR DECISION    INTRODUCTION    In letters dated September 182008 and September 232008(the “Reconsideration Applications), counsel for the  Concerned Citizens of Quail Ridge and Lochrem Road (“CCQRLR”) and Quail Ridge Residents Association  (“QRRA”), respectivelyrequested that the British Columbia Utilities Commission (the “Commission”) reconsider  its Decision as set out in Orders C0407 and G7507” (the “Decision”) (Exhibits B21B11).    An application for reconsideration by the Commission typically proceeds in two phases.  By Letter L5008 dated  October 222008the Commission established a written comment process on the Reconsideration Applications to address the first phase issue of whether a reasonable basis exists to allow a reconsideration (Exhibit A1).   Following the completion of the phase one comment processthe Commission typically decides whether or not a  reconsideration should proceed.  If the reconsideration proceeds to the second phasethe parties are allowed to  address the substance of the issues that the Commission approves for reconsideration   The Commission has reviewed the submission received on the Reconsideration Applications andas discussed at  greater length in the remainder of these Reasons for Decisionhas established a reconsideration of the Decision  on the limited initial issue of whether the proposed Ellison Substation at the Lochrem Road site will comply with  the requirements of NAV CANADA   BACKGROUND    In Order C0407dated May 92007the Commission granted a Certificate of Public Convenience and Necessity  (“CPCN”) to FortisBC to construct the Ellison Substation Project (the “Ellison Substation” or “Project”), and  directed FortisBC to submit a written report regarding the site for the substation which was the subject of the  CPCN.  In Order G7507dated June 282007the Commissionfollowing review of FortisBCs reportissued an  order approving the Lochrem Road site for the construction of the Ellison Substation as applied for in the  Application for the CPCN   In response to the Reconsideration Applicationsby letter dated October 212008FortisBC provided executed  copies of an Operating Agreement and Statement of Work Agreement with NAV CANADA (the “Agreements”)  (Exhibit C52).  In the letterFortisBC submitted that compliance with the NAV CANADA guidelines or adherence  to the Agreements does not introduce new information of a nature that is material enough to impact the  previous Decisionand requested that the Commission not accept the applications for reconsideration   In the first phase reconsideration written comment process established by Letter L5008the Commission  received submissions from CCQRLRQRRAFortisBCColin BechtelJudy ClaytonRhonie Horne and Bernice and  John Fortunat (Exhibits B22B15C51C31C11C61 and C41respectively).  FortisBC opposed the requests  for a reconsiderationwhile all the other submissions supported a reconsideration    
APPENDIX B to Order G-166-08 Page 2 of 4      CCQRLR RECONSIDERATION APPLICATION AND RELATED SUBMISSIONS    The CCQLR application enclosed a letter form NAV CANADA that raised no objection to the Ellison Substation  providing FortisBC agreed to certain conditions related to electromagnetic noiseand a copy of Transport  Canada requirements for facilities near airports (Exhibit B21).  The CCQLR submitted that this is a material new  development that the Commission was not aware of during the CPCN proceeding.  CCQRL argued that FortisBC  needs to agree to shut down the substation if necessaryand that it cannot make such an agreement without  Commission approval.  Alsoit appears that it is unknown whether the substation at the Lochrem Road site will  interfere with NAV CANADA systemsand that this risk may have influenced the Commissions decision had it  been aware of the risk.  CCQLR also questioned whether FortisBC has Transport Canada approval for the  proposed substation   In its submission dated October 282008FortisBC argues that there is nothing in the Reconsideration  Applications that suggests there is any basis whatsoever for a reconsideration in respect of Order C0407 issuing  the CPCN for the Ellison Project (Exhibit C51).  The Reconsideration Applications are in respect of the Lochrem  Road site andaccordinglythe only matter arising in the Reconsideration Applications is Order G7507.  That is the question is whether there has there been a fundamental change in circumstances or facts since the order  approving the Lochrem Road site was issued.  FurthermoreFortisBC submits that the change in circumstances  or facts must have a significant material implication in order to warrant a reconsideration   In response to CCQRLRFortisBC argues that it has the authority and capacity to enter into agreements with NAV  CANADA without prior Commission approval.  With respect to CCQRLRs second point FortisBC argues that  CCQRLR have put forward no evidence that the Ellison Substation will put aviation safety at riskand that  speculation of a change in circumstances in the future if FortisBC is unable to comply with NAV CANADA  requirements does not justify a reconsideration.  With regard to Transport CanadaFortisBC states that the  necessary Transport Canada approval has been obtained   In its October 312008 Reply SubmissionCCQRLR argues that the possibility that the substation may need to be  relocated at considerable expense is a fundamental change in circumstances (Exhibit B22).    QRRA RECONSIDERATION APPLICATION AND RELATED SUBMISSIONS    The QRRA application requests a reconsideration on the basis that NAV CANADAs letter identifies a risk that  FortisBC may need to shut down the Ellison Substation after it becomes operational (Exhibit B11).  Since this risk  was not raised in the CPCN proceedingthe letter creates a fundamental change in circumstances or facts   In responsethe FortisBC Final Submission notes that it has provided its Operating Agreement with NAV  CANADAand that rather than contemplating that the substation will be shutdownthe agreement provides for a  mutually agreed plan of action to resolve any concerns (Exhibit C51).  FortisBC states that this undermines the  QRRA issue about risk to the use of the site.  FortisBC also submits that if the agreement with NAV CANADA had  been before the Commissionit is not reasonable to suggest it would have made a difference to the  Commissions Decision.  FortisBC goes on to argue that the alleged risk of noncompliance with a regulation or  law that may impact the suitability of the Lochrem Road site is a risk that could have arisen with other  alternative sitesand that this risk is not a fundamental change in facts or circumstances    
APPENDIX B to Order G-166-08 Page 3 of 4      The QRRA Reply Submission dated October 302008 argues that the Operating Agreement with NAV CANADA  requires FortisBC to correct a problem that is compromising the Air Traffic Control system (B16).  QRRA submits  that whether FortisBC will be able to prevent the Ellison Substation from interfering with the systems is an  evidentiary issue for the reconsideration itself.  QRRA also questions whether the Commission has the  jurisdiction to resolve disputesas provided in the Operating Agreement.  QRRA also argues that the  reconsideration should address the CPCN for the substation as well as the Lochrem Road site.  The QRRA Reply  Submission also requested that existing Intervenors should be allowed to present evidence relevant to the topics  of the reconsideration   COMMISSION DETERMINATION    The Commission generally agrees with the submission of FortisBC that the Reconsideration Applications relate  principally to the suitability of the Lochrem Road site.  Howeveras it would appear that the potential to cause  interference with navigation and other systems at the Airport may result from the design of the substation as  well as the sitethe Commission considers that the Reconsideration Applications address the proposed Ellison  Substation at the Lochrem Road site   The Commission recognizes that CPCN approval for a project is often granted prior to the utility obtaining many  of the permits that it will need to construct the project.  Obtaining these permits is part of the usual process of  carrying out a projectand the utility may need to make certain commitments to regulatory and other  government agencies to obtain them   Howeverthe Commission is concerned that this potentially serious issue has surfaced at this late date in the  development of the Ellison Substation Project.  It seems clear that the Lochrem Road site is close enough to the  Kelowna Airport to fall within the zone of interest of NAV CANADA and Transport Canada.  Furthermore FortisBC has agreed to install monitoring equipment and to correct any issues caused by the substation that are  identified under the terms of the Agreements   A need to relocate or even significantly modify the substation appears likely to be a ratepayer cost.  Any such  additional costsif materialwould represent a material change to the facts and circumstances that were before  the Commission when it granted a CPCN for the Ellison Substation at the Lochrem Road site   At this timethe Commission is unclear as to the significance of the risk that the Agreements with NAV CANADA  may require FortisBC to make significant changes to the substationor perhaps relocate it.  In the interest of  regulatory efficiencythe Commission will deal with this initial question by a reconsideration on its merits of this  matterand will limit the reconsideration to this specific issue.  Depending on the outcome of this initial stage of  the reconsiderationthe Commission may need to undertake a more broad reconsideration of other aspects of  the Decisionincluding consideration at some length of alternatives if there is a material problem with the  Lochrem Road site   Thereforethe Commission finds that it will consider the initial issue of whether the Ellison Substationas  proposed and approved at the Lochrem Road sitewill cause problems for the systems at the Kelowna Airport  as specified in the Agreements andif problems are causedthe changes that will be needed to remedy the  situationand the cost of the changes (the “Initial Issue”).  The Commission hereby establishes a written  hearing and Regulatory Timetable to address the Initial Issue    
APPENDIX B to Order G-166-08 Page 4 of 4      The Agreements are already on the record (Exhibit C52).  To provide evidence to support the consideration of  the Initial Issueby MondayDecember 12008FortisBC will file an independent engineering Report (the  Report”) by a properly qualified individual or group that reviews the siting and design of the Ellison  Substation as proposed and approvedrelative to the requirements of NAV CANADA as set out in the  Agreementsand which confirms that the substation will comply with the requirements.  If this confirmation  cannot be providedthe Report will describe the changes to the substation that are needed to bring it into  complianceand the estimated cost of these changes.  FortisBC will provide a copy of the Report to Intervenors  and Interested Parties in the Ellison Substation CPCN proceedingparties who participated in the Phase One  comment process and NAV CANADA (collectively, “Participants”).    The Commission determines that Participants will have an opportunity to submit Written Evidence regarding  the Initial Issue and the Report    