LETTER NO. L‐3‐09 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ERICA M. HAMILTON VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660‐4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1‐800‐663‐1385 web site: http://www.bcuc.com FACSIMILE: (604) 660‐1102 Log No. 28135 VIA E‐MAIL January 9, 2009 To: Mr. R. Brian Wallace, Joint Industry Electricity Steering Committee Registered Intervenors (BCH‐2007 Rate Design RI) Ms. Joanna Sofield, British Columbia Hydro and Power Authority Re: British Columbia Hydro and Power Authority (“BC Hydro”) Transmission Service Rate (“TSR”) F2008 Annual Report ‐ Commission Order G‐190‐08 Request for Extension of Written Submissions The Joint Industry Electricity Steering Committee (“JIESC”) in its letter to the Commission dated January 7, 2008, requests an extension to the deadline for JIESC to provide Intervenor comments with regard to the TSR F2008 Annual Report. JIESC explains that it has discussed the matter with BC Hydro and JIESC understands that BC Hydro does not object to the requested extension. The Commission agrees that an extension is warranted and subsequently amends Commission Order G‐190‐08 Direction No. 1 to read as follows: Intervenors and stakeholders are to provide written submissions to the Commission regarding the TSR F2008 Annual Report and BC Hydro’s proposed Terms of Reference by Tuesday, January 20, 2009, and BC Hydro is to provide its reply submissions to the Commission by Tuesday, February 10, 2009. Yours truly, Original signed by: Erica M. Hamilton DC/cms PF/BCH_TSR F2008 Annual Report/Gen Cor/Amended Schedule
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.