                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by the British Columbia Transmission Corporation  to Amend the BCTC Open Access Transmission Tariff     and    A Complaint by TransCanada Energy Ltd Re BCTC Firm Transmission Sales to Alberta    BEFORE:   A.ARhodesPanel Chair  L.AOHaraCommissioner  P.EVivianCommissioner    O  R  D  E  R    WHEREAS   A. On June 32008the British Columbia Transmission Corporation (“BCTC”)  applied to the British Columbia  Utilities Commission (“BCUC”, “the Commission”) to suspend the release for sale of additional Firm Available  Transfer Capacity (“Firm ATC”) on the British Columbia to Alberta path (the “BC>AB Path”) and to suspend  the Facilities Study relating to requests for additional service on the BC>AB Pathand    B. On July 32008the Commission issued Order G11008 (the “Suspension Order”), granting BCTCs June 3 2008 application.  In granting the Suspension Orderthe Commission directed BCTC to address certain issues  raised in that application in the context of BCTCs next Open Access Transmission Tariff (“OATT”) Application  or Rate Design reviewand to provide a Tariff provision to address the issuesand    C. The OATT includes the ratestermsand conditions (including tariff supplementsof the nondiscriminatory open access transmission service offered by BCTC.  OATT is modeled on a pro forma tariff established by  Federal Energy Regulatory Commission (“FERC”) Order No888 (the pro forma tariff), as recently amended  by FERC Order No890and    D. On July 142008BCTC held a consultation session concerning the implementation of FERC Order No890 The consultation discussed the following issuesthe potential impact of incremental sales of firm  transmission on existing firm transmission service on the BC>AB Paththe simultaneous submission window and performance metrics and operational penaltiesand             BRIT I SH  COLU   MBIA   U   T I L I T I ES  COM   MISS ION               ORDER       NUMBER   G   309            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    January 152009 
          BRIT ISH  COLUMBIA     UTIL IT IES  COMMISS ION               ORDER       NUMBER   G309  2        E. On October 92008TransCanada Energy Ltd. (“TCE”) filed a complaint (the “Complaint”) with the  Commission with respect to BCTCs release for sale of Firm ATC on the BC>AB Pathand    F. By letter dated October 172008the Commission requested comment from BCTC on its views on a process  to review the Complaintand     G. By letter of October 312008BCTC responded to the Commissionstating that BCTC anticipated filing its  OATT application by November 212008and that the application would address the issues raised by TCE and    H. By letter dated October 242008NorthPoint Energy Solutions (“NorthPoint”) submitted that it had also  been negatively impacted in a manner similar to that provided for in the ComplaintNorthPoint stated that  it anticipated filing a complaintand    I. By letter dated November 42008Cargill Power Markets LLC (“Cargill”) requested thatas a power marketer  with a reservation on the BC>AB Path that could be affected by the Complaintit be informed of further  developments with respect to the Complaintand be provided with the opportunity to intervene if and  when appropriateand    J. On November 132008the Commission issued Letter L5308advising TCE that the Commission would after receipt of the OATT applicationissue a procedural letter or order to solicit submissions on the  appropriate process or processes for reviewing the Complaint and the applicationincluding the appropriate  degree of separation between the reviews of the Complaint and applicationand     K. On November 212008BCTC filed an application to amend the OATT (the “Application”), pursuant to  subsections 5859and 60 of the Utilities Commission Act (“UCA”, the “Act”); and      L. BCTC indicated that the Application constitutes its response to the Complaintand      M. As part of the ApplicationBCTC sought an interim orderpursuant to section 89 of the Actand section 15 of  the Administrative Tribunals Actrequiring that specified new Service Agreements indicate that they are  subject to a further Commission order on the Application.  The requirement would apply to transmission  service rollover requests by British Columbia Hydro and Power Authority (“BC Hydro”) on the BC>AB Path  and any queued requests for Firm ATC coming available on the BC>AB Path on January 12009and    N. Commission Order G17508dated November 272008required BCTC to indicate on two specified BC  Hydro rolloversand any contracts for Firm Available transfer capacity coming available on the BC>AB Path  on January 12009that   This Service Agreement is subject to a further order of British Columbia Utilities Commission in  the matter of the British Columbia transmission Corporation Application to Amend the Open  Access Transmission Tariff”; and 
          BRIT ISH  COLUMBIA     UTIL IT IES  COMMISS ION               ORDER       NUMBER   G309  3          O. By letter dated November 282008TCE reiterated its view that the Complaint should not be heard together  with the BCTC OATT Application.  FurtherTCE objected to BCTCs request for an interim order for release of  180MW of Firm ATC upon the expiration of a BC Hydro contract having no rollover rights.  TCE also re stated the essential elements of its Complaintandand    P. By Order G19508the Commission established a Procedural Conference for January 82009 to address  procedural mattersand    Q. At the Procedural Conferencethe Commission Panel heard submissions on the scope of the regulatory  reviewthe review format for the principal issuesand whether the Application and the Complaint could be  properly dealt with in a combined proceeding or separate proceedingsand    R. The Commission has considered the submissions made at the Procedural Conference     NOW THEREFORE the Commissionwith Reasons to followorders that   1. The BCTC OATT Amendment Applicationexcept for the parts of Part 6 of the Application that are a response  to the Complaintwill be reviewed through a Written Hearing Process.  This proceeding will be termed the  OATT Amendment Hearing.”  For this hearingBCTC is the Applicant   2. The Complaintand the parts of Part 6 of the Application that are a response to the Complaintwill be  reviewed through an Oral Hearing process.  This proceeding will be termed the “TCE Complaint Hearing.”   For this hearingBCTC is the Respondent   3. There will be a common evidentiary record for  both the OATT Amendment and TCE Complaint Hearings.     4. The Regulatory Timetable attached as Appendix A to this order describes the schedules for both hearings.        DATED at the City of Vancouverin the Province of British Columbiathis           15 th              day of January 2009     BY ORDER      Original signed by     L.AOHara    Commissioner  Attachment  Orders/G309_BCTC OATT_TCE Complaint ‐ RegTimetable  
APPENDIX A  to Order G309  Page 1 of 1    British Columbia Transmission Corporation   Application to Amend the BCTC Open Access Transmission Tariff (“OATT”)    and    A Complaint by TransCanada Energy Ltd Re BCTC Firm Transmission Sales to Alberta      REGULATORY TIMETABLE    Description OATT Hearing TCE Hearing PACA Submissions Monday, January 26, 2009 Monday, January 26, 2009 BCUC IR#1-OATT Friday, February 06, 2009 BCUC IR#1-Complaint Thursday, February 12, 2009 Intervenor IR#1-OATT Friday, February 13, 2009 Respondent & Intervenors IR#1-Complaint Thursday, February 19, 2009 BCTC Response OATT IR#1 Friday, February 27, 2009 TCE Response Complaint IR#1 Thursday, March 05, 2009 Intervenors Evidence-OATT Friday, March 13, 2009 Respondent & Intervenors Evidence- Friday, March 13, 2009 Complaint IR on Intervenors Evidence-OATT Friday, March 27, 2009 IR on Respondent & Intervenors Evidence- Monday, April 06, 2009 Complaint Intervenors Response to IR on OATT Wednesday, April 15, 2009 Evidence Respondent & Intervenors Response to IR Wednesday, April 15, 2009 on Complaint Evidence Procedural Conference (if needed) Friday, April 17, 2009 Friday, April 17, 2009 Rebuttal Evidence - Complaint Wednesday, April 22, 2009 Rebuttal Evidence - OATT Wednesday, April 22, 2009 Oral Hearing Tuesday, April 28, 2009  
APPENDIX B  to Order G309  Page 1 of 3      An Application by the British Columbia Transmission Corporation  to Amend the BCTC Open Access Transmission Tariff     and    A Complaint by TransCanada Energy Ltd Re BCTC Firm Transmission Sales to Alberta    REASONS FOR DECISION    By letter dated October 92008 TransCanada Energy Ltd. (“TCE”) filed a Complaint with the British Columbia  Utilities Commission (“BCUC” or “Commission”) against the British Columbia Transmission Corporation (“BCTC”)  concerning its service agreement with BCTC for Long Term Firm Capacity PointtoPoint Transmission Service  and the availability of Firm Capacity on the B.Cto Alberta Intertie (“the TCE Complaint” or “Complaint”).    By letter dated October 172008 the Commission requested BCTCinter aliato comment on an appropriate  process to address the TCE Complaint   By letter dated October 312008 BCTC advised that it expected to file its next Open Access Transmission Tariff  (“OATT”) Application by November 212008and that the OATT Application would address the issue of Firm  Sales to Albertaand thus the issues raised in the TCE Complaint.  BCTC submitted that “(ithe [OATT Application should be considered BCTCs response to the Complaint and (iithe Complaint should be heard at  the same time as the [OATTApplication.  The detailed procedural steps for addressing both the Complaint and  the [OATTApplicationincluding the issue of whether an oral hearing is appropriateshould be addressed  during a joint procedural conference convened for that purpose following the filing of the [OATTApplication.”    By letter dated November 62008 TCE submitted that the TCE Complaint should not be combined with BCTCs  OATT Application as the process for the OATT Application could not adequately address all the issues raised in  the TCE Complaint   By letter dated November 132008 the Commission stated that it would consider the appropriate process for  reviewing the TCE Complaint once it had received BCTCs OATT Application.      BCTC filed its OATT Application on November 212008 (Exhibit B11and stated that the OATT Application also  constituted its response to the TCE Complaint   On December 172008 the Commission issued Order G19508 that establishedinter aliaa joint Procedural  Conference to review the regulatory processes for the OATT Application and the TCE Complaint to be held on  January 82009 (Exhibit A2).    The January 82009 Procedural Conference was attended by representatives of:  BCTC;  TCEBritish Columbia  Hydro and Power Authority (“BC Hydro”) and Powerex Corp. (“Powerex”); NorthPoint Energy Solutions Inc (“NorthPoint Energy”); TransAlta Energy Marketing Corp. (“TransAlta”); British Columbia Old Age Pensioners  Organization et al. (“BCOAPO”); and the Joint Industry Electricity Steering Committee (“JIESC”).       
APPENDIX B  to Order G309  Page 2 of 3      BCTC submitted that the TCE Complaint should be heard at the same time as the OATT Application, (Part 6 of  which deals with Firm Sales to Alberta), with a common evidentiary record.  BCTC proposed one round of  Information Requests (“IRs), with Commission IRs firstand a written hearing processexcept for the possibility  of an oral hearing for the TCE Complaint and Part 6 of the OATT Application.  BCTC also suggested that to  streamline the proceedingsBCTC could be treated as the applicant throughoutwith the TCE Complaint being  treated as intervenor evidence.  BCTC also agreed that a second Procedural Conference would be useful prior to  any oral hearing process   BC Hydro/Powerex supported BCTCs submission that the OATT Application and the TCE Complaint should share  the same evidentiary record and timetableand also submitted that two rounds of IRs would be appropriate and  further proposed a second Procedural Conference   The remaining Intervenorsother than TCEwere either supportive of the process proposed by BCTC or relatively  indifferent as to the process.  Some were specific in their comments about supporting the most efficient and  costeffective process with minimal duplication of effort   TCE submittedinter aliathat its Complaint ought to be heard on a standalone and expedited basis prior to the  OATT Application.  TCE argued that the issues to be resolved in its Complaint are urgentand that it is suffering  and will continue to suffer financial harm as well as continuing damage to its reputation and relationships with  its counterparties.  TCE also submitted that its Complaint includes a retroactive componentwhich would  involve different considerations beyond those that fail to be addressed in the OATT Application.  TCE suggested  that its Complaint is selfcontained and discrete and that a number of other parties have only intervened to be  involved in its ComplaintTCE also suggested that resolution of its Complaint prior to any determination in the  OATT Application might inform certain aspects of the OATT Application.  TCE also submitted that if its Complaint  and the OATT Application were to be heard togetherthere should be a discrete module for the Complaint with  its own process and schedule and a separate decision should be rendered   BCTC noted that there are common facts and issues in the TCE Complaint and the OATT Application which are  inextricably woven together.  BCTC submitted that the same parties are interestedthe issues are technicaland  that any consideration of a retroactive adjustment would necessarily involve a tariff amendment.  BCTC  highlighted that there could be a risk of inconsistent findings on identical issues if the two proceedings were  heard at different timespossibly by different panels.  BCTC further noted that both proceedings were at the  same stage of advancement and that the timetable put forward by TCE for the hearing of its Complaint could be  readily accommodated by the timetable being discussed for the OATT Application   The Commission Panel notes the concerns of TCE in terms of urgency but agrees with BCTC that resolution of  the Complaint can be adequately accommodated within the timeframe proposed for the OATT Application.  The  Commission Panel is of the view that there are common facts and issues in the OATT Application and TCE  Complaint which are inextricably linked and is further of the view that the most efficient and expedient process  would be to hear the OATT Application and the TCE Complaint at the same timewith one evidentiary record.   Thereforethe TCE Complaint will be heard at the same time as the OATT Applicationwith one evidentiary  record   The Commission Panel has also determinedhoweverthat the OATT Applicationexcept for those parts of Part 6  related to the Complaintcan be addressed by a written processbut that the Complaintand those parts of Part  6 responsive to the Complaintshould be the subject of an oral hearing.  The Commission Panel notes that the  OATT amendments in the BCTC Application are voluminous and ofttimes technical in nature and are drawn  from the lengthy FERC Orders 890890A and 890B.  The Panel is persuaded that these amendments can most 
APPENDIX B  to Order G309  Page 3 of 3      effectively be dealt with in a written process.  The Commission Panel understands that there will be some  overlap and crossover from the examination and resolution of the Complaint and the relevant parts of Part 6 of  the OATT Application and the Commission Panel agrees that the resolution of the Complaint may inform and  impact upon the relevant OATT amendments in Part 6.  Howevergiven the common record for the two  proceedingsany such overlap should be manageable.  Some of the amendments proposed in Part 6 will not be  relevant to the issues at play in the Complaint and can be best dealt with in the written process.     For the purposes of the common evidentiary record BCTC will continue in its role as Applicant for the OATT  Applicationwith a right of Replyand TCE will remain Complainant in its Complaintwith the corresponding right  of Reply on matters relating to the Complaint.  BCTC will be the Respondent for the purposes of the Complaint   The Commission Panel has considered the representations made at the Procedural Conference with respect to  the Regulatory Timetable.  BCTC suggested April 13th for the Oral Hearing.  TCE proposed an interval of 13  weeks from the date of submission of Commission IRs to the Oral Hearing.  The TCE proposal provided for the  timing of BCUC IRs to TCE to take place “As soon as practicable.”  Assuming three weeks from the Procedural  Conference for the first Commission IRthe TCE schedule would result in the Oral Hearing commencing the week  of April 27th.  Based on those representationsand after considering other scheduling matters such as Easter the Commission Panel determines that the Regulatory Timetable for the hearings to the date of the  commencement of the hearing of the Complaint will be in accordance with the Regulatory Timetable attached  as Appendix A to Commission Order G309  