Orders

Decision Information

Decision Content

                      BRIT ISH  COLU   MBIA       UTIL IT IES  COM   MISSION                       ORDER         NUMBER   G   3309                      SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Assessment Report by the British Columbia Transmission Corporation  and the Determination of Reliability Standards for Adoption in British Columbia      BEFORE DCoteCommissioner  April 12009    O  R  D  E  R    WHEREAS   A. Pursuant to Section 125.2(2of the Utilities Commission Act (the “Act”) the British Columbia Utilities  Commission (the “Commission”) has exclusive jurisdiction to determine whether a “reliability standard”,  as defined in the Actis in the public interest and should be adopted in British Columbiaand  B. In order to facilitate the Commission's consideration of reliability standardsthe British Columbia  Transmission Corporation (“BCTC”) is required under Section 125.2(3of the Act to review each  reliability standard and  provide the Commission with a report assessing (a any adverse impact of the reliability standard on the reliability of electricity  transmission in British Columbia if the reliability standard were adopted (b the suitability of the reliability standard for British Columbia (c the potential cost of the reliability standard if it were adoptedand  (d any other matter prescribed by regulation or identified by order of the Commission.;  and    C. On March 272009BCTC filed a report (the “Assessment Report”) pursuant to Section 125.2(3of the  Act assessing 103 reliability standards developed by the North American Electric Reliability Corporation  (“NERC”) and the Western Electricity Coordinating Council (“WECC”); and  . . ./2 
      BRIT ISH  COLUMBIA   UTIL IT IES  COMMISSION         ORDER    NUMBER   G3309    2    D Pursuant to Section 125.2(5)(aof the Actthe Commission will post the Assessment Report on its  website at www.bcuc.com and invites public comments on the Assessment Reportand  E. The Commission wishes to establish a Regulatory Timetable for public comment and review of the  reliability standards assessed in the Assessment Report     NOW THEREFORE the Commission orders as follows   1. In accordance with the Regulatory Timetable attached as Appendix A to this Orderany person wishing  to comment on the reliability standards assessed in the Assessment Report must deliver written  comments to the Commission by no later than MondayMay 42009with a copy to BCTC at the  following address   Suite 1100Four Bentall Centre  1055 Dunsmuir StreetPO Box 49260VancouverBC  V7X 1V5  AttentionJanet FraserDirector Regulatory Affairs    2. BCTC will file with the Commission any comments in response to the public comments received by no  later than ThursdayMay 212009   3. The Commission mayif it considers necessarydeliver information requests to BCTC and/or person(s who have submitted comments.  Any such information requests will be delivered by TuesdayJune 2 2009and recipients of the information requests must reply by ThursdayJune 182009   4. BCTC will publish the Notice of Assessment Report and Process for Public Comments that is attached as  Appendix B to this Orderin the Vancouver Sunthe Victoria Times Colonistthe Provinceand such other  local papers as will provide sufficient coverage of its service areaas soon as it is practical to do so     DATED at the City of Vancouverin the Province of British Columbiathis                  1 st                 day of April 2009     BY ORDER    Original signed by     DCote    Commissioner  Attachment Order/G3309_BCTCMRS Regulatory Timetable 
                                SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com        An Assessment Report by the British Columbia Transmission Corporation  and the Determination of Reliability Standards for Adoption in British Columbia      REGULATORY TIMETABLE      ACTION  Written Comments of Public to Commission and BCTC  BCTC Reply Comments  Commission Information Requestsif necessary  Responses to Information Requests                        APPENDIX A    to Order G3309  Page 1 of 1            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102    DATE (2009   MondayMay 4    ThursdayMay 21    TuesdayJune 2    ThursdayJune 18     
                      APPENDIX B        to Order G3309      Page 1 of 2                            TELEPHONE:  (604)  6604700  SIXTH FLOOR900 HOWE STREETBOX 250  BC TOLL FREE:  18006631385  VANCOUVERB.C.  V6Z 2N3   CANADA  FACSIMILE:  (604)  6601102  web sitehttp://www.bcuc.com          NOTICE OF ASSESSMENT REPORT   AND PROCESS FOR PUBLIC COMMENTS        An Assessment Report by the British Columbia Transmission Corporation  and the Determination of Reliability Standards for Adoption in British Columbia      ASSESSMENT AND ADOPTION OF RELIABILITY STANDARDS    Pursuant to the Utilities Commission Act (the “Act”) the British Columbia Utilities Commission (the  Commission”) has exclusive jurisdiction to determine whether a “reliability standard” is in the public interest  and should be adopted in British ColumbiaThe term "reliability standardis defined in the Act as "a reliability  standardrule or code established by a standard making body for the purpose of being a mandatory reliability  standard for planning and operating the North American bulk power systemand includes any substantial  change to any of those standardsrules or codes".    In order to facilitate the Commission's consideration of reliability standardsthe British Columbia Transmission  Corporation ("BCTC") is required under the Act to review each reliability standard and provide the Commission  with a report assessing (a) any adverse impact of the reliability standard on the reliability of electricity transmission in British  Columbia if the reliability standard were adopted (b) the suitability of the reliability standard for British Columbia;   (c) the potential cost of the reliability standard if it were adoptedand  (d) any other matter prescribed by regulation or identified by order of the Commission   On March 272009BCTC filed its Assessment Report on 103 reliability standards developed by the North  American Electric Reliability Corporation ("NERC") and the Western Electricity Coordinating Council ("WECC").    The Commission has posted BCTCs Assessment Report on its website at www.bcuc.comand invites public  comments on the reliability standards assessed in the Assessment Report   After considering the Assessment Report and the submissions that it receivesthe Commission will make a  determination on each of the 103 standardsto either adopt the standard or refer it to a hearing that will  consider whether the standard is in the public interest    
Appendix B   to Order G3309  Page 2 of 2    REQUEST FOR COMMENTS    Commission Order G3309 establishes a Regulatory Timetable and process for comments.  Any person wishing  to comment on BCTCs Assessment Report and the reliability standards that are assessed in it must deliver  written comments to the Commission by no later than MondayMay 42009with a copy to BCTC at the  following address   Suite 1100Four Bentall Centre  1055 Dunsmuir StreetPO Box 49260Vancouver BC  V7X 1V5  AttentionJanet FraserDirector Regulatory Affairs     All written comments on the Assessment Report will be placed on the public record and posted to the  Commissions website     PUBLIC INSPECTION OF THE ASSESSMENT REPORT    The Assessment Report is available for inspection at the following locations   BC Transmission Corporation  Suite 1100Four Bentall Centre  1055 Dunsmuir Street  Vancouver BC  V7X 1V5  Telephone: (6046997328    BC Utilities Commission  Sixth Floor900 Howe Street  Vancouver BC  V6Z 2N3  Telephone: (6046604700  www.bcuc.com    FURTHER INFORMATION    For further informationplease contact MsErica HamiltonCommission Secretary as follows   Telephone: (6046604700  B.CToll Free18006631385  Facsimile: (6046601102  Emailcommission.secretary@bcuc.com   