                                  SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  British Columbia Transmission Corporation  Reconsideration of the  Interior to Lower Mainland Transmission Project  Reconsideration Application for Participant Assistance/Cost Award Funding – Interim Award  BEFORE A.JPullmanCommissioner      O  R  D  E  R  WHEREAS   A. On August 252009the Commission by Order F2109 pursuant to section 118(1of the Utilities  Commission Act awarded interim funding to a number of participants including the Hwlitsum First Nation  (“Hwlitsum”) for its participation in the British Columbia Transmission Corporation (“BCTC”) Reconsideration  of the Interior to Lower Mainland Transmission Project (“ILM Project”); and    B. The Hwlitsum was awarded $16,622.38 with Reasons for Decision attached as Appendix A to Order F2109.   The Commission made the interim award based on 50 percent of the total Budget Estimate of $33,244.75 and    C. On August 312009 the Hwlitsum submitted a request for reconsideration of its interim cost award of  $16,622.38 (“Reconsideration Application”).  The Hwlitsum submit that its Budget Estimate should have  totalled $56,074.68.  An Interim Award based on 50 percent of this Budget Estimate would be $28,037.34 and    D. The Commission has reviewed the Reconsideration Application and determined that an amended interim  award is warranted in accordance with the Reasons for Decision as set out in Appendix A to this Order                 BRIT I SH  COLU   MBIA     UTIL I T I ES  COMM   I S S ION             ORDER       NUMBER   F   2709          TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102              September 242009  . . ./2 
                  2  NOW THEREFORE the Commission orders as follows   1 Pursuant to section 118(1of the Utilities Commission Actthe Commission awards interim funding of  $25,287.34 to the Hwlitsum .    2 BCTC is directed to reimburse the Hwlitsum in a timely manner by way of a cheque for a total interim  funding award of $25,287.34.  If BCTC has already paid the $16,622.38 interim award as directed in Order   F2109 then BCTC is to reimburse the difference in the amount of $8,664.96     DATED at the City of Vancouverin the Province of British Columbiathis   24               Attachment      Orders/F2709_BCTC ILM PACA Amended Interim Funding Hwlitsum   BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   F2709        th      day of September 2009 BY ORDER  Original signed by A.JPullman  Commissioner 
APPENDIX A  to Order F2709  Page 1 of 2      British Columbia Transmission Corporation  Reconsideration of the  Interior to Lower Mainland Transmission Project    Reconsideration Application for Participant Assistance/Cost Award Funding – Interim Award      REASONS FOR DECISION    1.0 INTRODUCTION    On August 252009the Commission by Order F2109 pursuant to section 118(1of the Utilities Commission Act  awarded interim funding to a number of participants including the Hwlitsum First Nation (“Hwlitsum”) for its  participation in the British Columbia Transmission Corporation (“BCTC”) Reconsideration of the Interior to Lower  Mainland Transmission Project (“ILM Project”).    The Hwlitsum was awarded $16,622.38 with Reasons attached as Appendix A to Order F2109.  The Commission  made the interim award based on 50 percent of the total Budget Estimate of $33,244.75     2.0 RECONSIDERATION APPLICATION OF PARTICIPANT ASSISTANCE/COST AWARD INTERIM AWARD    On August 312009 the Hwlitsum submitted a request for reconsideration of its interim cost award of  $16,622.38.  The Hwlitsum submit that its Budget Estimate should have totalled $56,074.68 and not $33,244.75.   An Interim Award based on 50 percent on a Budget Estimate of $56,074.68 would be $28,037.34   The Hwlitsum explains the submission of July 92009 provided a budget estimate composed of actual costs  incurred from March to July 92009 in the amount of $22,829.93and estimated costs from July 102009  onwards in the amount of $33,244.75   The table below illustrates the basis of the revision of the requested interim award     Existing Interim  Requested  Award  Interim Award    Invoice for March to July 92009    $22,829.93  Budget for July 102009 onwards  $33,244.75 33,244.75  Total Budget Estimate  $33,244.75 $56,074.68      Interim Award calculation based on 50 $16,622.38 $28,037.34      The Hwlitsum submit that the two cost estimates together result in an overall budget estimate of $56,074.6850  percent of which is $28,037.34.  The Hwlitsum requests that the award of $16,622.38 provided in Order F2109  be increased to $28,037.34which is 50 percent of the overall budget estimate.         
APPENDIX A  to Order F2709  Page 2 of 3      The detailed costs included in the budget estimate are   Item  Amount    First Portion (March to July 92009 $22,829.93 Invoice for Legal Services 68 hours x $200/hour = $13,600 + GST + $476.55  of expenses = $14,756.55   Invoice received for consultant services6 days x $1,000/day = $6,000 + GST  + $251.38 of expenses = $6,551.38    Invoice from Chief Raymond Wilson 2 days x $500/day = $1,500 + no GST +  $22.00 of expenses = $1,522.00     Total First Portion  $22,829.93   Second Portion (July 10 – September 212009 $33,244.75 Legal Services10 days x $1,600/day = $16,000 + transportation costs of  $650.00 = $16,650.00    Consultant 12 days x $1,000/day = $12,000      Chief Raymond Wilson cost estimate8 days x $500/day = $4,000    Meals for 3 persons x 48.25 x 1 day = $144.75    Accommodation for 3 persons x $150 per night x 1 night = $450.00    Total Second Portion  $33,244.75   Total Budget Estimate  $56,074.68   It appears that the Hwlitsum is seeking reimbursement of $5,500.00 for Chief Raymond Wilson as a consultant  or case manager.  The biography in the Budget Estimate filing indicates that Chief Wilson is an Elder and  Hereditary Chief of the Hwlitsum First Nation and the elected Chief of the Hwlitsum First Nation since 1999.  The  Commission does not normally award consulting or case manager costs for a person who is a representative of  the Intervenor.  No exceptional circumstance was indicated by the participantthereforethe Commission Panel  declines to award interim funding at this time for Chief Wilson.  Howeverthe Participant Assistance/Cost Award  GuidelinesAppendix A to Order G7207do include a provision for foregone earnings up to a maximum of $175  per proceeding day.  The Hwlitsum may wish to include recovery for foregone earnings for Chief Wilson in its  application for a final award   The Commission Panel considers that the Budget Estimate should be at the $50,574.68 amount without costs for  Chief WilsonAccordingly50 percent of the modified Budget Estimate of $50,574.68 is $25,287.34      
The Commission approves an Interim Award of costs to the Hwlitsum of $25,287.34 instead of the interim  award amount of $16,622.38.  The Hwlitsum will need to justify all its costs in its final application to ensure it  meets the criteria stated in the PACA Guidelines.  The final award by the Commission will be based on the total  submission of costs that conform to the PACA Guidelines including the total maximum funding days allowed.  In  the event that the final award amount is less than the total approved Interim Award amountthe participant is  required to reimburse the difference back to the utility      APPENDIX A  to Order F2709  Page 3 of 3     
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.