SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com IN THE MATTER OF  The Utilities Commission ActR.S.B.C1996Chapter 473  and  An Application by the British Columbia Hydro and Power Authority  to Amend Street Lighting Rate Schedules 1702 and 1703   BEFORE D.ACoteCommissioner      O R D E R  WHEREAS   A On August 272009the British Columbia Utilities Commission (the “Commission”) received an application  (the “Application”) from British Columbia Hydro and Power Authority (“BC Hydro”) proposing amendments  to the terms and conditions of its Electric TariffRate Schedules 1702 and 1703pursuant to sections 5861  of the Utilities Commission Act (the “Act”); and    B The proposed amendments create rates applicable to street lighting fixtures fitted with automated dimming  controlsand    C BC Hydro expects street lighting fixtures fitted with automated dimming controls to encourage energy  conservationfurthering BC Hydro Power Smart objectivesand allowing customers pay less for street  lighting energyand    D The Province has demonstrated its support for dimming technology by awarding $1.3 million to northern  B.Cmunicipalities to implement dimming on 8,000 to 10,000 street lightsand    E The Application includes letters from the Cities of BurnabyDeltaPrince Georgeand Vancouver supporting  the proposed amendmentsand    F BC Hydro sent copies of the Application to Stakeholders – parties who registered as Intervenors in the  BC Hydro 200910 Revenue Requirements proceedingand    G BC Hydro proposes January 12010 as the effective date for the revised Rate Schedules.  To accomplish this BC Hydro proposes an expedited reviewlimited to written submissions from Stakeholders   BRIT ISH  COLU MBIA   UTIL IT IES  COM MISS ION         ORDER     NUMBER   G 11209  TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102         September 242009    . . ./2 
2  NOW THEREFORE the Commission orders as follows   1. The regulatory review process will be by written submissions from Stakeholders.  Stakeholders should  submit their comments by October 9in accordance with the Regulatory Timetable attached as Appendix A  to this Order   2. BC Hydro is directed to add the Insurance Corporation of British Columbia (“ICBC”) to the list of Stakeholders  for the reviewand to send ICBC a copy of the Application as soon as practicable     DATED at the City of Vancouverin the Province of British Columbiathis     24                 Attachment  Order/G11209_BCHRate Schedule 17021703 ‐ Reg Timetable BRIT ISH  COLUMBIA   UTIL IT IES  COMMISS ION         ORDER    NUMBER   G11209  th       day of September 2009   BY ORDER  Original signed by D.ACote  Commissioner 
    British Columbia Hydro and Power Authority  Application to Amend Street Lighting Rate Schedules 1702 and 1703          REGULATORY TIMETABLE      ACTION  Submission of Stakeholder Comments  BC Hydro Final Submission  APPENDIX A  to Order  G11209  Page 1 of 1          DATE  FridayOctober 9 MondayOctober 26   
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.