                  LETTER NOL5609                  SIXTH FLOOR900 HOWE STREETBOX 250  ERICA MHAMILTON  VANCOUVERB.C.  CANADA  V6Z 2N3  COMMISSION SECRETARY  TELEPHONE:  (604)  6604700  Commission.Secretary@bcuc.com  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102  Log No29698  VIA EMAIL        August 62009    MrRobin Lucas  MsJoanna Sofield  President  Chief Regulatory Officer  Line Contractors’ Association of BC  British Columbia Hydro and Power Authority  Unit 3241238888 th  Avenue  333 Dunsmuir Street  SurreyBC   V3W 7R7  VancouverB.C.   V6B 5R3        Dear MrLucas and MsSofield   Re:  British Columbia Hydro and Power Authority (“BC Hydro”)  Customer Complaint – Line Contractors’ Association of British Columbia (“LCA”)    On June 82009 the British Columbia Utilities Commission (the “Commission”) received a complaint from the  LCA stating that BC Hydro is exercising unjust and unreasonable practices in its contracting with the private  power line contractor sectoras represented by the LCA (the “LCA Complaint”).      The LCA Complaint includes four key issues   1. BC Hydros misleading and false statements regarding cost effectivenessand  2. BC Hydros failure to develop a formal policy on competitive tenderingand  3. Unnecessary expense to ratepayersand   4. Negative impressions towards the LCA   Under section 26(aof the Utilities Commission Actthe LCA requests the following relief   1. The Commission immediately direct BC Hydro to make formal written withdrawal of its claims made  before the Commission of superior costeffectiveness to the private power line contractorsand   2. The Commission immediately direct BC Hydro to shut down its grossly inefficient field construction  services work forceand   3. The Commission to determine a set of just and reasonable standards and practices to ensure that BC  Hydro assigns its line work to the private sector on a competitive basis going forward.     On July 62009 BC Hydro responded to the LCA Complaint and submits that it is unfounded and untimelyought  to be dismissed without further process.  In its responseBC Hydro noted that it intends to fully address the  issues raised by the LCA in the F2011 Revenue Requirements Application (“RRA”).  On July 172009 the LCA filed  its response to the BC Hydro submission       …/2 
      2  LETTER NOL5609        The Commission has reviewed the submissions and dismisses the LCA Complaint against BC Hydro noting that  the LCA did not intervene in the F2009/10 RRA proceeding.  The Commission is concerned with the disparity in  the parties positionshoweveris of the view that the appropriate forum for addressing such concerns is a  Revenue Requirement proceeding.  As a resultthe Commission directs BC Hydro to fully address the issues  raised in the LCA Complaint in its F2011 RRAwhich is expected to be filed in February 2010.        Yours truly     Original signed by     Erica MHamilton    CM/cms    Orders/L5609_BCH_Line Contractors Complaint ‐ Final 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.