SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and An Inquiry into British Columbia’s Electricity Transmission Infrastructure and Capacity Needs for the Next 30 Years BEFORE: L.A. O’Hara, Commissioner and Panel Chair A.W.K. Anderson, Commissioner D.A. Cote, Commissioner M.R. Harle, Commissioner R.K. Ravelli, Commissioner O R D E R WHEREAS: A. By Order G‐111‐09 the British Columbia Utilities Commission (“Commission”) established a timetable for Regional Sessions open to all Participants and the public to discuss issues related to regional transmission needs in relation to the Inquiry, including potential generation resources and anticipated regional electricity demand; and B. On September 21, 2009, the Commission received a letter from the We Wai Kai Nation (Cape Mudge Indian Band) requesting that Nanaimo Regional Session be rescheduled to avoid a conflict with a First Nations Summit Meeting in Vancouver scheduled for the period of November 25‐27, 2009; and C. The Commission has considered the We Wai Kai Nation’s request and determined that the Nanaimo Regional Session should be rescheduled. NOW THEREFORE the Commission orders as follows: 1. Paragraph 1 of Order G‐111‐09 is varied to the extent that the Nanaimo Regional Session is rescheduled to take place on Tuesday, December 1, 2009. 2. Details on the specific location and timing of the Nanaimo Regional Session will be released after British Columbia Hydro and Power Authority, British Columbia Transmission Corporation and FortisBC Inc. have filed their preliminary evidence. 3. A revised Regional Session schedule is attached as Appendix A to this Order. DATED at the City of Vancouver, in the Province of British Columbia, this 24 Attachment Orders/ G‐114‐09_Section 5_Revised Regional Workshop Schedule BRIT I SH CO LUMBIA UTIL IT I ES CO MMISS ION ORDER NUMBER G ‐114‐09 TELEPHONE: (604) 660‐4700 BC TOLL FREE: 1‐800‐663‐1385 FACSIMILE: (604) 660‐1102 September 24, 2009 th day of September 2009. BY ORDER Original signed by: L.A. O’Hara Commissioner
APPENDIX A to Order G‐114‐09 Page 1 of 1 An Inquiry into British Columbia’s Electricity Transmission Infrastructure and Capacity Needs for the Next 30 Years REVISED REGIONAL SESSION SCHEDULE LOCATION DATE (2009) Fort St. John, BC Wednesday, October 14 Fort Nelson, BC Tuesday, October 20 Terrace, BC Friday, October 23 Prince George, BC Monday, October 26 Kelowna, BC Monday, November 16 Cranbrook, BC Thursday, November 19 Sechelt, BC Monday, November 23 Nanaimo, BC Tuesday, December 1
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.