Orders

Decision Information

Decision Content

                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  An Inquiry into British Columbias Electricity Transmission Infrastructure  and Capacity Needs for the Next 30 Years  BEFORE L.AOHaraCommissioner and Panel Chair    A.W.KAndersonCommissioner    D.ACoteCommissioner    M.RHarleCommissioner    R.KRavelliCommissioner  O  R  D  E  R  WHEREAS   A. By Order G11109 the British Columbia Utilities Commission (“Commission”) established a timetable for Regional Sessions  open to all Participants and the public to discuss issues related to regional transmission needs in relation to the Inquiry including potential generation resources and anticipated regional electricity demandand    B. On September 212009the Commission received a letter from the We Wai Kai Nation (Cape Mudge Indian Band requesting that Nanaimo Regional Session be rescheduled to avoid a conflict with a First Nations Summit Meeting in  Vancouver scheduled for the period of November 25272009and    C. The Commission has considered the We Wai Kai Nations request and determined that the Nanaimo Regional Session  should be rescheduled   NOW THEREFORE the Commission orders as follows   1. Paragraph 1 of Order G11109 is varied to the extent that the Nanaimo Regional Session is rescheduled to take place on  TuesdayDecember 12009   2. Details on the specific location and timing of the Nanaimo Regional Session will be released after British Columbia Hydro  and Power AuthorityBritish Columbia Transmission Corporation and FortisBC Inchave filed their preliminary evidence   3. A revised Regional Session schedule is attached as Appendix A to this Order.     DATED at the City of Vancouverin the Province of British Columbiathis   24             Attachment  OrdersG11409_Section 5_Revised Regional Workshop Schedule           BRIT I SH  CO   LUMBIA     UTIL IT I ES  CO   MMISS ION               ORDER       NUMBER   G   11409            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385      FACSIMILE:  (604)  6601102    September 242009  th        day of September 2009 BY ORDER  Original signed by L.AOHara  Commissioner 
    APPENDIX A   to Order G11409   Page 1 of 1          An Inquiry into British Columbias Electricity Transmission Infrastructure  and Capacity Needs for the Next 30 Years       REVISED REGIONAL SESSION SCHEDULE        LOCATION  DATE (2009) Fort StJohnBC  WednesdayOctober 14  Fort NelsonBC  TuesdayOctober 20 TerraceBC  FridayOctober 23 Prince GeorgeBC  MondayOctober 26 KelownaBC  MondayNovember 16 CranbrookBC  ThursdayNovember 19 SecheltBC  MondayNovember 23 NanaimoBC  TuesdayDecember 1    
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.