                                  SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com  IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  A Filing by British Columbia Hydro and Power Authority   For Acceptance of an Electricity Purchase Agreement     BEFORE L.FKelseyCommissioner    O  R  D  E  R  WHEREAS   A Pursuant to Section 71 of the Utilities Commission Act (the “Act”) on September 242009 the British  Columbia Hydro and Power Authority (“BC Hydro”) filed with the Commission an Electricity Purchase  Agreement (“EPA”) with Tembec Industries Incin relation to its Purcell Power Plant (the “Filing”) located at  the Tembec Pulp Mill operation in Skookumchuck (the “Tembec Pulp Mill”) and the Filing was revised on  October 282009and    B The Commission acknowledges receipt of the Justification Report for the EPA which BC Hydro included in the  Filingand    C Commission Order G3801 dated April 52001 requires BC Hydro to determine a customer base line for  customers capable of selling excess selfgenerated electricity to market based either on the historical energy  consumption of the customer or the historical output of the customers generatorand    D Commission Order G1702 dated March 142002 extends the requirements of Order G3801 until the  Commission determines otherwiseand                  BRIT I SH  COLU   MBIA     UTIL I T I ES  COMM   I S S ION             ORDER       NUMBER   E   1609        TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102          November 132009  . . ./2 
2  E The Tembec Pulp Mill has retained its original 15 MW steam turbinegenerator unit for emergency backup  since 1997and    F. The Commission has reviewed the historic energy consumption at the Tembec Pulp Mill and considered the  Filing by BC Hydro and its revisionand has determined that it is in the public interest   NOW THEREFORE the Commission orders that the EPA set out in Appendix A to this Order is accepted for filing  as an energy supply contract pursuant to section 71 of the Act   DATED at the City of Vancouverin the Province of British Columbiathis           13               Attachment    Orders/F1609/BCHEPATembec BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   E1609    th          day of November 2009 BY ORDER  Original signed by L.FKelsey  Commissioner 
    British Columbia Hydro and Power Authority  Electricity Purchase Agreement  Seller Company Name  Project  Tembec Industries Inc Purcell Power Plant  APPENDIX A  to Order E1609  Page 1 of 1  Location  Capacity  Cranbrook  24.4 MW 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.