                                  SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com      IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  An Application by British Columbia Hydro and Power Authority  Toad River Electrification Project Application  BEFORE A.JPullmanPanel Chair and Commissioner    A.ARhodesCommissioner  O  R  D  E  R    WHEREAS   A British Columbia Hydro and Power Authority (“BC Hydro”) applied to the British Columbia Utilities  Commission (the “Commission”) for a Certificate of Public Convenience and Necessity (“CPCN”) to supply  electricity to the community of Toad River under its  Remote Community Electrification (“RCE”) Program  (the “Application”) on June 192009 pursuant to sections 4546 and 61 of the Utilities Commission Act (the  Act”); and    B Toad River is a new service area that will not be interconnected to the existing BC Hydro electrical system  and is the first community to receive electricity under the RCEand    C In the ApplicationBC Hydro seeks orders which grant a CPCN to serve the community of Toad River and for  electricity tariff amendments to have Toad River listed as a Rate Zone ll communityand    D BC Hydro states that the Application for the community of Toad River is consistent with the 2007 Energy  PlanElectricity Policy Actions No27 and No28and BC Hydros RCE 20year Program Planand    E As required by the CPCN Application Guidelines and Letter L1804Appendix P of the Application includes  the additional requirements for a New Service Areaand    F On June 252009 the Commission issued a letter to BC Hydro stating that it was considering proceeding with  the Application on its own motion without further processrequesting comments from the BC Hydro  F2009/F2010 Revenue Requirements Application Intervenors by July 102009and the provision of an  evidentiary update on the Liard First Nation issues by July 312009and                        BRIT I SH  COLU   MBIA   U   T I L I T I ES  COM   MISS ION               ORDER       NUMBER   F   2509            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102        November 122009    …/2 
      BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION               ORDER       NUMBER   F2509  2          G The British Columbia Old Age Pensioners Organization et al. (“BCOAPO”), B.CSustainable Energy  Association et al. (“BCSEA”), Commercial Energy Consumers Association of British Columbia (“CEC”) and the  Joint Industry Electricity Steering Committee (“JIESC”) filed comments on the regulatory process proposed  by the Commission and the process for streamlining future RCE applications andon July 172009BC Hydro  filed its reply to the commentsand    H On July 232009 the Commission issued Letter L5309 supporting a workshop to be held on August 142009  on the RCE program and the Toad River Electrification Project (the “Project”) and requesting that parties file  information requests with regard to the RCE program and the Project by FridayJuly 312009 and that  BC Hydro provide a response to the information requests by August 112009and    I BCOAPOBCSEA and CEC provided information requests to BC Hydro and BC Hydro responded to all of the  information requests on August 122009and    J On August 142009 BC Hydro held a workshop in Vancouver and on August 212009provided a list of  attendees and a summary of comments at the workshop on the RCE program and the streamlining of the  regulatory process for the RCE programand    K In accordance with the Commissions letter dated July 232009BCOAPO”, BCSEA and CEC provided final  written comments in respect of the Application on August 212009and    L On September 152009 the Commission issued Order C409 granting a CPCN to BC Hydro for a diesel  generation plant to serve Toad River as set out in the Application and approving its agreement to take  ownership of the distribution system in Toad River currently owned by the Northern Rockies Regional  Municipalityand    M By letter dated September 302009BC Hydro advised the Commission that it had reviewed the BCOAPO  cost award application and leaves it to the Commissions discretion as to the level of the cost award to be  madeand    N By letter dated November 92009BC Hydro advised the Commission that it had reviewed the BCSEA cost  award application and does not object to the participant assistance request made by BCSEAand leaves it to  the Commissions discretion as to the level of the cost award to be madeand    O The Commission has reviewed the applications for cost awards with regard to the criteria and rates set out  in Order G7207   . . . /3 
                3      NOW THEREFORE the Commission orders as follows   1. Pursuant to section 118(1of the Utilities Commission Actthe Commission awards funds to the following  participants for their participation in the proceeding that reviewed the BC Hydros Application for the Toad  River Project   Participant  British Columbia Old Age PensionersOrganizationet al BC Sustainable Energy Association and Sierra Club of British Columbia  TOTAL Award    2. BC Hydro is directed to reimburse the above noted participants by way of cheque for the total amounts  awarded in a timely manner     DATED at the City of Vancouverin the Province of British Columbiathis       day of November 2009               Orders/F2509_BCH RCE_Toad River_CPCNPACA   BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   F2509    Application  Award  $4,328.62  $4,328.62  $ 6,846.42   $4,348.31 $11,175.04     $8,676.93 BY ORDER  Original signed by A.JPullman  Panel Chair and Commissioner 
  APPENDIX A  to Order F2509  Page 1 of 4      An Application by British Columbia Hydro and Power Authority  Toad River Electrification Project Application    Applications for Participant Assistance/Cost Award Funding    REASONS FOR DECISION  1.0 INTRODUCTION    On September 152009the British Columbia Utilities Commission (the “Commission”) issued Order C409  granting British Columbia Hydro and Power Authoritys (“BC Hydros”) application for a Certificate of Public  Convenience and Necessity for its Toad River Electrification Project (“Application”).    Pursuant to section 118 of the Utilities Commission Act (the “Act”) the Commission received applications for  Participant Assistance/Cost Awards (“PACA”) from the following Intervenors for participation in the review of  the Application   Participant  Date Application for PACA   Cost Award  Funding Received  Requested  BC Old Age Pensioners’ Organization et al (“BCOAPO”)  September 12009  $4,328.62  BC Sustainable Energy Association and Sierra Club of  September 282009  British Columbia  $6,846.42    On September 302009 and November 92009the Commission received letters from BC Hydro stating that the  amounts requested by these Intervenors are to be determined by the Commission   Section 118 of the Act provides that the Commission Panel may make cost awards for participation in a  proceeding.  The Commissions PACA Guidelines are set out in Appendix A to Order G7207 and state   The Commission Panel will determine whether a Participant is eligible or ineligible for an  award.  In determining an award of all or any portion of a Participants coststhe  Commission Panel will first consider whether the Participant has a substantial interest in a  substantial issue in the proceeding.  If this criterion is not metthe Participant will typically  not receive a cost award exceptpossiblyfor outofpocket disbursements   Except in limited circumstancesit is expected that only ratepayer groups will establish a  substantial interest in a substantial issue” so as to be eligible for an award in a revenue  requirements proceeding.  For the purposes of this sectionthe principal interest of  ratepayer groups” will be the rate impacts of the revenue requirement to be paid by the  ratepayer Participants.  The Commission Panel will also consider other characteristics of the  Participantincluding the scope and significance of the principal concerns of the Participant   Participants other than “ratepayer groups” may be eligible for funding in energy supply  contractrate designresource planand CPCN proceedings provided that the Participant  meets the “substantial interest in a substantial issue” criterion  
  APPENDIX A  to Order F2509  Page 2 of 4      The Commission Panel will then consider the following   (i) Will the Participant be affected by the outcome   (ii) Has the Participant contributed to a better understanding of the issues by the  Commission   (iii) Are the costs incurred by the Participant for the purposes of participating in the  proceeding fair and reasonable   (iv) Has the Participant joined with other groups with similar interests to reduce costs   (v) Has the Participant engaged in any conduct that tended to unnecessarily lengthen  the duration of the proceeding?  (This criterion will notby itselfdisqualify a  Participant for pursuing a relevant position in good faith and with reasonable  diligence.)    (vi) Any other matters appropriate in the circumstances   If the Commission Panel considers it to be an appropriate consideration in a proceedingthe  Commission Panel may consider the Participants ability to participate in the proceeding without an  award.”  2.0 PROCEEDING AND PREPARATION DAYS    Section 4 of the PACA Guidelines states that proceeding days may include workshop daysnegotiation dayspre hearing conference daysand hearing daysand that the Commission Panel may award costs for preparation  daystypically on a ratio of up to two preparation days per proceeding day   Maximum daily costs for legal counsel and consultants are based on an eighthour day and are to be prorated  for part days.  As the review of the Application involved one workshop dayand one round of information  requeststhe Commission estimate was six preparation days for legal counsel and consultants 3.0 PACA APPLICATIONS    The Commission Panel accepts BCOAPO as an eligible ratepayer group as defined in the Commissions PACA  Guidelines.     For the Applicationthe Commission Panel does not accept BCSEA as an eligible ratepayer group as defined in  the Commissions PACA Guideline but accepts that BCSEA may still be eligible for PACA funding to the extent it  demonstrates “a substantial interest in a substantial issue” in this resource plan reviewEach PACA applicant  must demonstrate that it contributed to a better understanding of the issues by the Commission and that its  costs are fair and reasonable.      
  APPENDIX A  to Order F2509  Page 3 of 4      The Commission Panel now reviews andwhere necessaryadjusts the PACA application amounts as follows   3.1 BCOAPO    The Commission Panel has reviewed the BCOAPO PACA Application which is for two days of legal expenses at  $1,200 per dayand one and onequarter days of consultant fees at $1,250 per day.  The maximum daily fees  shown are in accordance with those in Order G7207 Commission Determination  The Commission Panel finds that BCOAPO contributed to a better understanding of the issuesand  determines that the total award for BCOAPO is $4,328.62 including PST (legal services onlyand GST   3.2 BCSEA    The Commission Panel has reviewed the BCSEA PACA Application which is for 2.7 days of legal expenses at  $1,800 per day0.625 days of consultant fees at $1,250 per day and 0.75 of a day of case managers fee at $500  per day.  The maximum daily fees shown are in accordance with those in Order G7207.     The Commission Panel notes that the PACA Application is approximately 1.6 times higher than the other PACA  Application.  Furthermorethe Commission Panel observes that significant portion of the cost relates to the time  spent by legal counsel and a case managerAs this was a short written process rather than an oral hearing Commission Panel believes that the time requested for legal counsel and the case manager should be reduced.      The Commission Panel reviewed the proceeding documents and has determined BCSEA information requests  generally focused on issues dealing with the use of diesel generation versus the use of renewable resourcesThe  Commission Panel accepts this was an issuebut found that the issue was of narrow scope and properly  addressed in the Application such that BCSEAs involvement did not contribute significantly to a better  understanding of the broader scope of issues.     The relatively narrow scope of the BCSEAs involvement in the proceeding limited the extent to which it  contributed to a better understanding of the issuesConsidering this and the need for costs to be fair and  reasonablethe Commission Panel reduces the amount of its application to 1.75 days for counsel and zero  days for case managerThe Commission Panel therefore also disallows the $207.91 airfare expense claimed by  the case manager   The Commission Panel recalculates the PACA Award amount as follows   BCSEA  Days  Rate per  Total  GST @  PST @ 7 Total 2  Day  5 Counsel  1.75  $1,800  $3,150.00 $157.50 $220.50  $3,528.00 Consultant  0.625  $1,250  $781.25 $39.06    $820.31 Case Manager  0  $500  $0.00       $0.00 Total        $3,931.25       $4,348.31      
    Commission Determination  The Commission Panel determines that the total award for BCSEAet al is $4,348.31 including PST (legal  services onlyand GST 4.0 COMMISSION DETERMINATION    The Commission Panel determines that the total award for this proceeding is as follows   Participant  British Columbia Old Age PensionersOrganizationet al  BC Sustainable Energy Association and Sierra Club of British Columbia  TOTAL Award        APPENDIX A  to Order F2509  Page 4 of 4  Award  $4,328.62  $4,348.31  $8,676.93   