Orders

Decision Information

Decision Content

                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com  IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    A Filing by British Columbia Hydro and Power Authority  For Acceptance of an Electricity Purchase Agreement      BEFORE LFKelseyCommissioner    PEVivianCommissioner      O  R  D  E  R    WHEREAS   A. Pursuant to Section 71 of the Utilities Commission Act (the “Act”) on September 302009 British Columbia Hydro and  Power Authority (“BC Hydro”) filed with the British Columbia Utilities Commission (“Commission”) an Electricity  Purchase Agreement (“EPA”) with Dokie General Partnerships in relation to its Dokie 1 Wind Project (the “Filing”); and    B. The Commission acknowledges receipt of the Justification Report for the EPA which BC Hydro included in the Filingthe  Additional Information filed October 72009and the Additional Information filed October 192009and    C. The Commission has considered the Filing and the Additional Information filed by BC Hydroand has determined that  the EPA is in the public interest     NOW THEREFORE the Commission orders that the EPA set out in Appendix A to this Order is accepted for filing as an  energy supply contract pursuant to section 71 of the Act.  The Commission will hold confidential the EPAthe Justification  Report and the Additional Information filed     DATED at the City of Vancouverin the Province of British Columbiathis                  30               Attachment          BRIT ISH  COLU   MBIA   UTIL IT IES  COM   MISSION             ORDER       NUMBER   E   1409          TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102  October 292009  th                          day of October 2009 BY ORDER  Original signed by LFKelsey  Commissioner   
British Columbia Hydro and Power Authority  Electricity Purchase Agreement      Seller Company Name  Project  Dokie General Partnership  Dokie 1 Wind Project     APPENDIX A  To Order NoE1409  Page 1 of 1      Location  Capacity  Chetwynd  144 MW 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.