SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, B.C. V6Z 2N3 CANADA web site: http://www.bcuc.com  IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  An Application by FortisBC Inc for a Certificate of Public Convenience and Necessity  for the Upgrade and Life Extension of the Corra Linn Unit 2 Generating Plant  BEFORE L.FKelseyCommissioner    P.EVivianCommissioner      CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY  WHEREAS   A On February 272009 the British Columbia Utilities Commission (the “Commission”) approved the  FortisBC  Inc. (“FortisBC”) 20092010 Capital Expenditure Plan (the “CEP”), as amended per Order G1109,and in  accordance with said Order on July 202009 FortisBC applied (the “Application”) to the Commission pursuant to section 45 of the Utilities Commission Act (“the Act”), for a Certificate of Public Convenience and  Necessity (“CPCN”) for an Upgrade and Life Extension to its Corra Linn Unit 2 generating plant located on the  Kootenay River between Castlegar and NelsonB.C. (the “Project”); and    B. The Project is estimated to cost $19.964 million (reduced from $22.681 million as specified in the CEPand  will replace 77 year old components that will extend the plants life for a further 40 years and increase the  utility systems reliability and available energy entitlements as provided for in the Canal Plant Agreement and     C. The Project includes upgrades to the Corra Linn Power House Crane and East Wingdam Handrailand  completion of the Corra Linn Spillway Gate Isolation Studyand    D. The Project is supportive of the Provinces energy objectives including those relating to energy self sufficiencyand    E. No First Nations have been identified as being adversely affected by the Project and FortisBC is not aware of  any First Nations’ claims or reserves located in the vicinity of the Projectand          BRIT I SH  COLUM B IA   UTIL I T I ES  COMM I S S ION         ORDER     NUMBER   C5 09    TELEPHONE: (604) 660-4700 BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102            September 172009    …/2 
BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER C509 2  F. A duly noticed Workshop related to the Project was held in KelownaB.Con August 122008with no  objections being made or received sinceand    G. The Application is unopposedand    H. The Commission has considered the Application evidence and submissions of FortisBCand    I. The Commission has considered the Application and has determined that the Project is in the public interest  and that a CPCN should be issued to FortisBC for the Corra Linn Unit 2 Project   NOW THEREFORE pursuant to sections 45 and 46 of the Actthe Commission orders as follows   1. A CPCN is granted to FortisBC to proceed with an Upgrade and Life Extension to the Corra Linn Unit 2  generating plant as set out in the Application   2. FortisBC is to file with the Commission quarterly project progress reports and a closing project report and  cost summary within three months of  Project completion     DATED at the City of Vancouverin the Province of British Columbiathis       17 th      of September 2009     BY ORDER      Original signed by     L.FKelsey    Commissioner      Orders/C509_FortisBC Corra Linn Unit 2 Generating Plant 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.