Orders

Decision Information

Decision Content

                                  SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  An Application by the British Columbia Transmission Corporation  to Amend the BCTC Open Access Transmission Tariff   and  A Complaint by TransCanada Energy Ltd Re BCTC Firm Transmission Sales to Alberta    BEFORE:   A.ARhodesPanel Chair  L.AOHaraCommissioner  P.EVivianCommissioner    O  R  D  E  R    WHEREAS   A. On June 32008the British Columbia Transmission Corporation (“BCTC”)  applied to the British Columbia Utilities  Commission (“BCUC”, “the Commission”) to suspend the release for sale of additional Firm Available Transfer Capacity  (“Firm ATC”) on the British Columbia to Alberta path (the “BC>AB Path”) and to suspend the Facilities Study relating to  requests for additional service on the BC>AB Pathand    B. On July 32008the Commission issued Order G11008 (the “Suspension Order”), granting BCTCs June 32008  application.  In granting the Suspension Orderthe Commission directed BCTC to address certain issues raised in that  application in the context of BCTCs next Open Access Transmission Tariff (“OATT”) Application or Rate Design review and to provide a Tariff provision to address the issuesand    C. The OATT includes the ratestermsand conditions (including tariff supplementsof the nondiscriminatoryopen  access transmission service offered by BCTC.  OATT is modeled on a pro forma tariff established by Federal Energy  Regulatory Commission (“FERC”) Order No888 (the pro forma tariff), which was recently amended by FERC Order  No890and    D. On July 142008BCTC held a consultation session concerning the implementation of FERC Order No890The  consultation included discussion ofthe potential impact of incremental sales of firm transmission on existing firm  transmission service on the BC>AB Paththe simultaneous submission windowand performance metrics and  operational penaltiesand    E. On October 92008TransCanada Energy Ltd. (“TCE”) filed a complaint (the “Complaint”) with the Commission with  respect to BCTCs decision to release additional LongTerm Firm Point to Point transmission capacity for sale on the  BC>AB Path in December of 2007and                     BRIT I SH  COLU   MBIA   U   T I L I T I ES  COM   MISS ION               ORDER       NUMBER   G   10209            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102          September 102009 
          BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION               ORDER       NUMBER   G10209  2        F. By letter dated October 172008the Commission requested comment from BCTC on its views on a process to review  the Complaintand    G. By letter of October 312008BCTC responded to the Commissionstating that BCTC anticipated filing its OATT  amendment application by November 212008and that the application would address the issues raised by TCEand    H. On November 132008the Commission issued Letter L5308advising TCE that the Commission wouldafter receipt  of the OATT amendment applicationissue a procedural letter or order to solicit submissions on the appropriate  process or processes for reviewing the Complaint and the applicationincluding the appropriate degree of separation  between the reviews of eachand     I. On November 212008BCTC filed its application to amend the OATT (the “OATT Amendment Application”), pursuant  to subsections 5859and 60 of the Utilities Commission Act (“UCA”, the “Act”); and      J. BCTC indicated that the OATT Amendment Application included its response to the Complaintand      K. As part of the OATT Amendment ApplicationBCTC sought an interim orderpursuant to section 89 of the Actand  section 15 of the Administrative Tribunals Actrequiring that specified new Service Agreements indicate that they are  subject to a further Commission order on the OATT Amendment Application.  The requirement would apply to  transmission service rollover requests by British Columbia Hydro and Power Authority (“BC Hydro”) on the BC>AB Path  and any queued requests for Firm ATC coming available on the BC>AB Path on January 12009and    L. Commission Order G17508dated November 272008required BCTC to indicate on two specified BC Hydro rollovers and any contracts for Firm Available Transfer Capacity coming available on the BC>AB Path on January 12009that   This Service Agreement is subject to a further order of British Columbia Utilities Commission in the  matter of the British Columbia Transmission Corporation Application to Amend the Open Access  Transmission Tariff”; and    M. By Order G19508the Commission established a Procedural Conference for January 82009 to address procedural  mattersand    N. At the Procedural Conferencethe Commission Panel heard submissions on the scope of the regulatory reviewthe  review format for the principal issuesand whether the OATT Amendment Application and the Complaint could be  properly dealt with in a combined proceeding or if separate proceedings were requiredand    O. Following the Procedural Conferencethe Commission issued Order G309 whereby it ordered that BCTCs OATT  Amendment Applicationother than the parts of Part 6 thereof dealing with TCEs Complaintwould be reviewed  through a Written Hearing Processto be termed the “OATT Amendment Hearing”; the Complaint and those parts of  Part 6 of the OATT Amendment Application in responsewould be reviewed through an Oral Hearing Process termed  the “TCE Complaint Hearing”; there would be a common evidentiary record for both the OATT Amendment Application  and the Complaintand established a Regulatory  Timetableand    P. The TCE Complaint Hearing Proceeded for two days commencing April 292009and    Q. The Commission Panel has now considered the evidence and the written submissions of BCTC and TCE and Registered  Intervenors for both the OATT Amendment Application and the Complaint  
                  3      NOW THEREFORE the Commission approves the OATT Amendment Applicationexcept as indicated in its Decision issued  issued concurrently with this Order     DATED at the City of Vancouverin the Province of British Columbiathis      10                   Orders/G10209_BCTC OATT Amendment Decision   BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   G10209    th             day of September 2009 BY ORDER  Original signed by Alison ARhodes  Panel Chair/Commissioner 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.