                                  SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com      IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  An Inquiry into British Columbias Electricity Transmission Infrastructure  and Capacity Needs for the Next 30 Years  BEFORE L.AOHaraCommissioner and Panel Chair    A.W.KAndersonCommissioner    D.ACoteCommissioner    M.RHarleCommissioner    R.KRavelliCommissioner    O  R  D  E  R    WHEREAS   A. Section 5(4of the Utilities Commission Act (“UCA” or “Act”) provides that the British Columbia Utilities  Commission (“Commission”) must conduct an inquiry (“Inquiry”) to make determinations with respect to  British Columbias infrastructure and capacity needs for electricity transmission for the period ending  20 years after the day the inquiry beginsor a different period if so specified by terms of reference issued  by the Minister responsible for administration of the Hydro and Power Authority Act (“Minister”); and    B. On December 112008 the Minister issued Terms of Reference for the Inquiry which identify that the  general purpose of the Inquiry is for the Commission to make determinations with respect to British  Columbias electricity transmission infrastructure and capacity needs for a 30year period commencing  from the date the Inquiry beginsand    C. The Terms of Reference directin partthat the Commission must publish the draft report on its  determinations on or before June 302010and    D. The Terms of Reference further direct the Commission to invite and consider submissionsevidence and  presentations from any interested personincludingwithout limitationFirst Nationscommunities municipal and regional governmentsother utilitiespower producersratepayer groups and environmental  nongovernmental organizationsand                      BRIT I SH  COLU   MBIA   U   T I L I T I ES  COM   MISS ION               ORDER       NUMBER   G   11109            TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385      FACSIMILE:  (604)  6601102          September 172009  . . . /2 
              2  E. The Terms of Reference provide that the Commission may make use of procedures to resolve specific issues  within the Terms of Referenceincludingas the Commission considers appropriateworkshopsmediations dispute resolution mechanismsprehearing conferencesworking groups and oral and written public  hearingsand    F. By Order G3009the Commission established a Preliminary Workshop on April 172009 for participants to  discuss issues related to the Terms of Reference and the process to be used for the Inquiryand a  Procedural Conference on April 272009 to discuss and hear submissions on Inquiry procedures and timing and    G. By Order G4709the Commission released a Preliminary Inquiry Schedule and established a Procedural  Conference on June 242009 for participants to discuss Inquiry issues and scopingand    H. By Order G10809the Commission determined thatalthough the Inquiry Panel does not owe an  independent duty to consult with First Nationsthe Inquiry Panel intends to establish meaningful  engagement to ensure First Nations have the ability to participate effectively in the Inquiry processand    I. The Commission has determined that it will be useful to hold a series of Regional Sessions open to all  Participants and the public to discuss issues related to regional transmission needs in relation to the  Inquiryincluding potential generation resources and anticipated regional electricity demandand    J.  The Commission has determined that a fourth Procedural Conference is required to discuss Inquiry issues  and timing along with further scope revisions     NOW THEREFORE the Commission orders as follows   1. A series of open Regional Sessions will take place from October 14 below   LOCATION  Fort StJohnBC  Fort NelsonBC  TerraceBC  Prince GeorgeBC  KelownaBC  CranbrookBC  SecheltBC  NanaimoBC      BRIT ISH  COLUMBIA   UTIL IT IES  COMMISS ION         ORDER       NUMBER   G11109        th  through November 25 th  as indicated  DATE (2009 WednesdayOctober 14  TuesdayOctober 20  FridayOctober 23  MondayOctober 26  MondayNovember 16  ThursdayNovember 19  MondayNovember 23  WednesdayNovember 25  . . . /3 
              3  2. A fourth Procedural Conference on Inquiry issuesprocedural timingand scope revisions will take place on  WednesdayOctober 282009commencing at 9:00 a.mat the Commission Hearing Room12 1125 Howe StreetVancouverBC   3. A Schedule for the remainder of the Inquiry along with details on specific locations and timing of the  Regional Sessions will be released after British Columbia Hydro and Power AuthorityBritish Columbia  Transmission Corporation and FortisBC Inchave filed their preliminary evidence     DATED at the City of Vancouverin the Province of British Columbiathis             17                                                                                                                           Original signed by       ORDERS/G11109_Section 5Regional Workshop Schedule   BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   G11109          th  Floor th           day of September 2009 BY ORDER  L.AOHara  Commissioner 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.