BRIT I SH  COLU MBIA   UTIL I T I ES  COMM I S S ION         ORDER     NUMBER   F 3209    SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com FACSIMILE:  (604)  6601102   IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  Applications for Participant Assistance/Cost Awards  in an Inquiry into British Columbias Electricity Transmission Infrastructure  and Capacity Needs for the Next 30 Years      BEFORE L.AOHaraCommissioner and Panel Chair  A.W.KAndersonCommissioner  D.ACoteCommissioner   October 262009    M.RHarleCommissioner    R.KRavelliCommissioner    O  R  D  E  R    WHEREAS   A. Section 5(4of the Utilities Commission Act (“UCA” or “Act”) provides that the British Columbia Utilities Commission  (“Commission”) must conduct an inquiry (“Inquiry”) to make determinations with respect to British Columbias  infrastructure and capacity needs for electricity transmission for the period ending 20 years after the day the Inquiry  beginsor a different period if so specified by terms of reference issued by the Ministerand    B. On December 112008the Minister responsible for administration of the Hydro and Power Authority Act (“Minister”)  issued Terms of Reference for the Inquiry which identify that the general purpose of the Inquiry is for the Commission  to make determinations with respect to British Columbias electricity transmission infrastructure and capacity needs  for a 30year period commencing from the date the Inquiry beginsand    C. By letter dated June 262009 (Exhibit A15), the Commission established a schedule for reviewing interim Participant  Assistance/Cost Award (“PACA”) applications for funding up to the June 242009 Procedural Conference.  Additionally in its letterthe Commission asked Participants requesting PACA for the remainder of the Inquiryand those who had  not already submitted interim requeststo file their budgets by August 142009and    D. On August 172009 and September 212009the Commission issued Orders F2009 and F2609 respectively awarding interim funds pursuant to section 118(1of the UCAand    E. By letter dated October 22009 (Exhibit A28), the Commission provided information to Participants on PACA funding  for the remainder of the Section 5 Inquiry whereby a bimonthly approval process was outlined and organized into a  number of Interim Funding Periodsand    F. By the October 152009 deadline established for Interim Funding Period 2 (in Exhibit A28), the Commission received  eleven applications requesting a total of $311,218 pursuant to section 118 of the Act for PACA funding for the  following Participants   …/2 
                    2      Participant  BC First Nations Energy and Mining Council  BC Old Age Pensioners Associationet al. BC Sustainable Energy Associationet al. (“BCSEAet al.”) Carrier Sekani Tribal Councilet al. Energy Solutions for Vancouver Islandet al. Haisla Nation  Hwlitsum First Nation  Stó: Tribal Council  Toquaht Nation  Treaty 8 Tribal Association We Wai Kai Nation (Cape Mudge Indian Band) Total Application    G. The Commission has reviewed the Period 2 PACA applications with regard to the criteria and rates set out in the  Guidelines in Commission Order G7207and has concluded thatafter adjusting the amounts of funding requested as  set out in the Reasons for Decision attached as Appendix A to this Ordercertain cost awards should be approved for  Participants in the Inquiry     NOW THEREFORE the Commission orders as follows   1. Pursuant to section 118(1of the Actand subject to paragraph 2 of this Orderthe Commission awards funds to the  following for their participation in the Inquiry   Participant  BC First Nations Energy and Mining Council  BC Old Age Pensioners Associationet al.   BC Sustainable Energy Associationet al.    Carrier Sekani Tribal Councilet al.     Energy Solutions for Vancouver Islandet al.    Haisla Nation  Hwlitsum First Nation  Stó: Tribal Council  Toquaht Nation  Treaty 8 Tribal Association   We Wai Kai Nation (Cape Mudge Indian Band) Total Award      BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION         ORDER     NUMBER   F3209  Application  $    50,976.32   $    24,199.00   $    39,499.19   $    12,800.20   $      5,699.25   $    15,343.50   $    36,389.07   $      7,618.10  $    31,822.54   $    71,475.12   $    15,395.50   $   311,217.79   Awarded  $     25,039.21   $     24,199.00   $     17,670.02  $     12,800.20   $       5,699.25   $       7,215.00  $     20,956.16   $       7,618.10  $       9,769.54   $     16,721.44   $       7,215.00   $   154,902.92      …/3 
          BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION               ORDER       NUMBER   F3209    3        2. If BC Hydrothe British Columbia Transmission Corporationand FortisBC Inc. (the “Utilities”) or any one of themhave  material concerns about the level or value of expenditures for Period 2 of one or more of the PACA applicantsthey  are to file a letter of comment with the Commission within ten (10days of this Orderand to provide a copy of the  letter to the affected PACA applicant.  The PACA applicant will have ten (10days from the date of the filing of the  letter of comment to file a reply with the Commission.  In the event that a letter of comment is receivedthe PACA  applicants interim award is subject to further order of the Inquiry Panel   3. In the absence of the filing of a letter of comment by the Utilitiesor any one of themBC Hydro is directed to pay the  Participant the amount of the Participants award in a timely manner     DATED at the City of Vancouverin the Province of British Columbiathis                  26 th               day of October 2009     BY ORDER      Original signed by     Liisa OHara    Panel Chair/Commissioner  Attachment    Orders/F3209_Section 5Period 2 PACA 
APPENDIX A  to Order F3209  Page 1 of 5        Inquiry into British Columbias LongTerm Transmission Infrastructure  Participant Assistance/Cost Award Applications    PERIOD 2 INTERIM AWARDS    REASONS FOR DECISION      1.0 INTRODUCTION    On October 22009the Commission issued a letter (Exhibit A28providing information to Participants on Participant  Assistance/Cost Award (“PACA”) funding for the remainder of the Section 5 Inquiry.  In the letterthe Inquiry Panel  implicitly acknowledged that the normal practice for PACA funding could create a barrier to effective participation in the  Inquiry and accordingly allowed for interim funding in the unique circumstances of the Inquiry   The letter outlines a bimonthly approval process for interim PACA applications and organizes the process into a number of  periods as shown below   Period  Period Start   Period End  PACA Application Filing  Number   Date   1   Inquiry Start   June 242009 July 32009  2   June 242009   September 302009 October 152009   3   October 12009   November 302009 December 152009   4   December 12009  January 312010 February 152010  5   February 12010  March 312010 April 152010  6   April 12010   May 312010 June 152010  7   June 12010   Inquiry End To be determined   Note:  Original table in Exhibit A28 incorrectly showed some dates as 2009 when in fact they were supposed  to read 2010.  A corrected table was published in Exhibit A29 and is reproducedin partabove   In order to expedite the bimonthly approval processthe Inquiry Panel also took the exceptional step of asking BC Hydro BCTCand FortisBC (the “Utilities”) to provide their comments to individual PACA applications on an exception only basis.   The normal practice on PACA applications has been for the Utilities to provide their comments in advance of any PACA  award by a Commission Panel   The Inquiry Panel had previously agreed to allow PACA applicants to reply to the comments about their individual PACA  applications made by the Utilities   As part of the expedited processthe Inquiry Panel has decided to issue provisional interim awards.  The amount of the  PACA applicants interim award will be subject to the filing of any letter of comment from the Utilitiesor any one of them on an exception basis within ten (10days of the order making the interim awardcopying the affected PACA applicantwith  a right of reply by the PACA applicant within ten (10days of the filing of the letter of comment and the Inquiry Panels  further determination.  If no letter of comment is received within the time provided for the filing of letters of commentthe  interim award is to be paid by BC Hydro in a timely manner.  In the event that a letter of comment is receivedthe PACA  applicants interim award is subject to further order of the Inquiry Panel   Copies of the individual PACA applications will be forwarded to the Utilities at the time of the issuing of these Reasons for  Decision    
APPENDIX A  to Order F3209  Page 2 of 5      Section 118 provides that the Commission may make cost awards for participation in a proceeding.  The Commissions PACA  Guidelines (“Guidelines”) are found in Appendix A to Order G7207 which sets out certain criteria a Commission Panel in a  proceeding may use to determine the amount of an awardif any.  If a Participant establishes that it has a “substantial  interest in a substantial issue” in a proceedingthe Commission will consider the following factors:     i. Will the Participant be affected by the outcome   ii. Has the Participant contributed to a better understanding of the issues by the Commission   iii. Are the costs incurred by the Participant for the purposes of participating in the proceeding fair and  reasonable   iv. Has the Participant joined with other groups with similar interests to reduce costs   v. Has the Participant engaged in any conduct that tended to unnecessarily lengthen the duration of the  proceeding?  (This criterion will notby itselfdisqualify a Participant for pursuing a relevant position in  good faith and with reasonable diligence.)    vi. Any other matters appropriate in the circumstances   If the Commission Panel considers it to be an appropriate consideration in a proceedingthe Commission Panel may  consider the Participants ability to participate in the proceeding without an award     2.0 PERIOD 2 PROCEEDING AND PREPARATION DAYS    Section 4 of the Guidelines states that proceeding days may include workshop daysnegotiation daysprehearing  conference daysand hearing daysand that the Commission Panel may award costs for preparation daystypically on a  ratio of up to two preparation days per proceeding day   Maximum daily costs for legal counsel and consultants are based on an eighthour day and are to be prorated for part days.   The Inquiry Panels determination of the number of prorated proceeding days in Period 2 is as follows     Proceeding Days  Duty to Consult with First Nations   Procedural Conference – August 18 1 Procedural Conference – August 19 1 TOTAL  2.0   The Inquiry Panel acknowledges that preparation of written and oral arguments in advance of the third Procedural  Conference was uniquely complex and time consuming.  Accordinglythe Inquiry Panel finds that a ratio of 3:1 preparation  days for each conference day for legal counsel is reasonableresulting in a total number of eight (8days that can attract  funding as the maximum for legal counsel for Period 2subject to other funding criteria.  The Inquiry Panel also finds the  standard ratio of 2:1 preparation days for each conference day for a consultant is reasonable because no expert witness  duties or preparation of technical evidence was required.  This finding results in a total number of six (6days that can  attract funding as the maximum for a consultant for Period 2subject to other funding criteria   The Inquiry Panel wants to ensure that all Participants understand that these are interim awards onlyin which maximum  days are determined by formula.  In its applicationBCSEAet alrequests the right to apply in a future Period for  reimbursement of time not reimbursed in a current Period.  BCSEAet alstatesin part  
APPENDIX A  to Order F3209  Page 3 of 5      “…it is possible that during the period in which the main oral hearing occurs the number of  proceeding days will yield a number of reimbursable days that exceeds the number of lawyercase  manager and expert days invoiced during that period alone.  Essentiallysome of the time not  reimbursed in earlier periods will be brought forward as preparation for the main hearing.  BCSEAet  alview this approach as implicit in the concept that the bimonthly PACA approval process will  count cumulatively up to the approved budget filed be the Participant.”    The Inquiry Panel agrees that BCSEAet al.’s comments accurately interpret the concept of the cumulative bimonthly PACA  process.  AdditionallyParticipants are reminded that final awards will be based on the contribution and value provided by a  PACA applicant to the Inquiryas well as the other criteria established by the guidelines.        3.0 PERIOD 2 PACA APPLICATIONS    By the October 152009 deadline establishedthe Commission received eleven applications summarized below   Participant  Application  BC First Nations Energy and Mining Council $    50,976.32   BC Old Age Pensioners Associationet al.   $    24,199.00   BC Sustainable Energy Associationet al.   $    39,499.19   Carrier Sekani Tribal Councilet al. $    12,800.20   Energy Solutions for Vancouver Islandet al. $      5,699.25   Haisla Nation  $    15,343.50   Hwlitsum First Nation  $    36,389.07   Stó: Tribal Council  $      7,618.10  Toquaht Nation  $    31,822.54   Treaty 8 Tribal Association $    71,475.12   We Wai Kai Nation (Cape Mudge Indian Band) $    15,395.50   Total Application  $   311,217.79       4.0 PERIOD 2 PREFUNDING FOR RELEVANT STUDIES    By the October 152009 deadline establishedthe Commission did not receive any detailed requests to prefund studies in  support of relevant evidence to be submitted to the Inquiry     5.0 ADJUSTMENTS TO INDIVIDUAL PERIOD 2 PACA APPLICATION AMOUNTS    5.1 Maximum Days    Individual Period 2 PACA applications have been adjusted to reflect the maximums   six (6allowed proceeding and preparation days for one consultantand  eight (8allowed proceeding and preparation days for one counsel   In some instancesthe Inquiry Panel has also allowed two days for funding of a case manager at a  maximum rate of $500 per day.  In addition to this general adjustmentthe Inquiry Panel has determined  that the maximum consultant rate that will be allowed is $1,250/day because no expert witness duties or  preparation of technical evidence was required.  In determining the rate awarded for counselthe Inquiry   
APPENDIX A  to Order F3209  Page 4 of 5      Panel has considered the rate requested in the application and the years of call of the counsel in  conjunction with the PACA guidelines   5.2 Expenses    A number of Participants applied for reimbursement of travel expenses that were not associated with the  third Procedural Conference and/or for reimbursement for multiple team members.  In its October 2 2009 letter (Exhibit A28the Commission stated   Some Participants have applied for reimbursement of costs associated with attendance  and preparation for BC Hydro sponsored activities.  The Inquiry Panel will not provide  PACA funds for participation in these BC Hydro activities.”    Individual Period 2 PACA applications have been adjusted to allowwhere applied fortravel expenses for  one counselone consultantand one case manager to the third Procedural Conferenceand other  relevant expenses as supported by receipts     5.3 Joint Efforts to Reduce Costs    In its October 22009 letter (Exhibit A28the Commission stated   Participants are strongly encouraged to combine their efforts wherever possible to  reduce costs or increase the effectiveness of their participation.  The Inquiry Panel will  review all applications for interim and final funding for the undertaking of studies to  determine whether there may beor has beena duplication of work.  If Participants are  not able to satisfy the Inquiry Panel that duplication could have been avoidedinterim or  final funding for the studies may be denied.”    In light of identical joint written (Exhibits C833C834C835C843C844 and C845and oral  submissions on First Nations Consultation Issuesthe Inquiry Panel was not satisfied that applications  from We Wai Kai (Cape Mudge Indian Bandand Haisla Nation warranted separate awards.  Accordingly the Period 2 award for these Participants was adjusted to award 4 days of legal counsel work for each plus reasonable expenses     6.0 INTERIM APPLICATIONS BY PARTICIPANTS WITHOUT AN APPROVED BUDGET    By letter dated June 262009 (Exhibit A15), the Commission asked Participants requesting participant assistance for the  remainder of the Inquiryand those who had not already submitted interim requeststo file their budgets by August 14 2009.  In additionin its October 22009 letter (Exhibit A28the Commission detailed the expedited PACA approval process  which contemplates the filing of budgets.  Between October 72009 and October 92009Commission Staff issued letters  to those Participants who filed budgets with the Commission informing Participants of the budget approved for the  expedited bimonthly cost awards from June 252009 until the end of the oral hearing.      The Commission received a Period 2 PACA application from Carrier Sekani Tribal Councilet al. (“CSTCet al.”) who have not  submitted a budget to the Commission.  In their October 132009 applicationCSTCet alreferenced their August 112009  letter to the Commission commenting on their inability to file a budget at that time and stated that   It is unclear how many proceeding days will take placewhether and to what extent our clients may  require the services of one or more consultants and whether will we be able to continue to pursue  our clients’ interest on a cooperative basis.  As suchwe find ourselves in no better position at this  time to submit a budget estimate that is anything by speculative.”   
      Section 2 of the PACA Guidelines requires a budgetand all other PACA applicants have filed budgets which were approved  by the Commission.  While the Inquiry Panel has awarded bimonthly funds to CSTCet alfor Period 2it will not continue  to do so in future periods until a budget is received and approved     7.0 PERIOD 2 COST AWARDS    Taking into account these adjustmentsthe PACA amounts applied for have been recalculated to determine the amount of  the award.  The BC Old Age Pensioners Associationet aldid not apply for interim funding for what is now referred to as  Period 1 and their award includes funds for both interim Periods 1 and 2.  The Period 2 awardsadjusted from the  application amountsare shown below   Participant  BC First Nations Energy and Mining Council BC Old Age Pensioners Associationet al.   BC Sustainable Energy Associationet al.   Carrier Sekani Tribal Councilet al.     Energy Solutions for Vancouver Islandet al. Haisla Nation  Hwlitsum First Nation  Stó: Tribal Council  Toquaht Nation  Treaty 8 Tribal Association  We Wai Kai Nation (Cape Mudge Indian Band) Totals    As outlined in Exhibit A28these awards will count cumulatively up to the approved budget filed by the Participant.   Participants are again reminded that these are interim awardsand costs above this approved budget amount may be  applied for at the end of the oral hearing.  Final awards will be based on the contribution and value provided by a PACA  applicant to the Inquiryas well as the other criteria established by the Guidelines    APPENDIX A  to Order F3209  Page 5 of 5  Application Awarded  $    50,976.32   $     25,039.21  $    24,199.00   $     24,199.00  $    39,499.19   $     17,670.02 $    12,800.20   $     12,800.20  $      5,699.25   $       5,699.25  $    15,343.50   $       7,215.00 $    36,389.07   $     20,956.16  $      7,618.10  $       7,618.10 $    31,822.54   $       9,769.54  $    71,475.12   $     16,721.44  $    15,395.50   $       7,215.00  $   311,217.79    $   154,902.92    