Orders

Decision Information

Decision Content

                              BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION                   ORDER       NUMBER   E1909            SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    A Filing by British Columbia Hydro and Power Authority  for Acceptance of an Electricity Purchase Agreement  from the Standing Offer Program      BEFORE L.FKelseyCommissioner    D.ACoteCommissioner  November 262009    P.EVivianCommissioner    O  R  D  E  R  WHEREAS   A Pursuant to section 71 of the Utilities Commission Act (the “Act”) on October 152009 British Columbia Hydro and  Power Authority (“BC Hydro”) filed with the British Columbia Utilities Commission (the “Commission”) an Electricity  Purchase Agreement (“EPA”) from the Standing Offer Program (“SOP”) for the Cedar Road LFG Project (the “Filing”);  and    B The Commission acknowledges receipt of Appendix Dwhich BC Hydro included in the Filing that sets out the key  projectspecific EPA amendments to the Standard Form SOP EPAand    C The Commission has considered the Filing and has determined that it is in the public interest     NOW THEREFORE the Commission orders that the Cedar Road LFG EPA set out in Appendix A to this Order is accepted for  filing as an energy supply contract pursuant to section 71 of the Act     DATED at the City of Vancouverin the Province of British Columbiathis           27 th                  day of November 2009     BY ORDER      Original signed by     D.ACote    Commissioner  Attachment    Orders/E1909_BCH Cedar Road SOPEPA 
    British Columbia Hydro and Power Authority  Electricity Purchase Agreement        Seller Company Name  Project  Cedar Road LFG Inc Cedar Road LFG               APPENDIX A  to Order E1909  Page 1 of 1        Effective Date  September 92009 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.