Orders

Decision Information

Decision Content

                  LETTER NOL9509                SIXTH FLOOR900 HOWE STREETBOX 250    VANCOUVERB.C.  CANADA  V6Z 2N3  ERICA MHAMILTON  TELEPHONE:  (604)  6604700  COMMISSION SECRETARY  BC TOLL FREE:  18006631385  Commission.Secretary@bcuc.com  FACSIMILE:  (604)  6601102  web sitehttp://www.bcuc.com  Log No3017830768  VIA EMAIL  bctc.regulatory@bctc.com  October 152009        British Columbia Transmission Corporation  Suite 1100Four Bentall Centre  1055 Dunsmuir Street  VancouverBC   V7X 1V5    Attention MsJanet Fraser    Director Regulatory Affairs    Dear MsFraser   Re:  British Columbia Transmission Corporation  Project Number 3698539  TransCanada Energy LtdComplaint regarding Firm Sales to Alberta    This letter is in response to British Columbia Transmission Corporations (“BCTC”) letter to the Commission dated  September 172009 seeking clarification of Commission Order G10309 (“Order”) and the accompanying Decision dated  September 102009 with respect to the TransCanada Energy Ltd. (“TCE”) Complaint   The Commission also received letters from TCE (September 242009), NorthPoint Energy Solutions Inc. (“NorthPoint”)  (September 222009and BC Hydro (October 12009).    The Commission hereby confirms its intention to limit Long Term Firm PointtoPoint sales to 480 MWgoing forwardby  amending those service agreements which contain the subject condition in respect of a further order of the Commission   The Commission therefore confirms that BCTC isin consultation with its affected customersto cancel the 350 MW of LTF  PTP service agreements containing the subject conditionas identified in Table 1 of BCTCs September 172009 letterand  allocate 45 MW of LTF PTP service and 305 MW of conditional periodconditional firm or nonfirm service to the affected  customers in a queue priority consistent with their preexisting priority rights.  The Commission further confirms that this  course of action will satisfy the terms of the Order G10309.  The Commission also confirms that “affected customers”  refers to NorthPoint and British Columbia Hydro and Power Authority   The Commission expects BCTC to implement the terms of the Order forthwithwithout further delay     Yours truly     Original signed by     Erica MHamilton  cms  cc MrDarren Angerman       TransCanda Energy Inc      alan_ross@transcanada.com    Registered Intervenors  Orders/L9509_BCTC_Clarification TCE Complaint Decision 
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.