Orders

Decision Information

Decision Content

                  LETTER NOL10609                  SIXTH FLOOR900 HOWE STREETBOX 250  ERICA MHAMILTON  VANCOUVERB.C.  CANADA  V6Z 2N3  COMMISSION SECRETARY  TELEPHONE:  (604)  6604700  Commission.Secretary@bcuc.com  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102  Log No31722  VIA EMAIL  bchydroregulatorygroup@bchydro.com  November 272009        MsJoanna Sofield  Chief Regulatory Officer  British Columbia Hydro and Power Authority  333 Dunsmuir Street  VancouverBC   V6B 5R3    Dear MsSofield   Re:  British Columbia Hydro and Power Authority  Electricity Purchase Agreements – Generator Baselines    On October 282008BC Hydro submitted a revised Electricity Purchase Agreement (“EPA”) with Tembec  Industries Inc. (“Tembec”), and the Commission by Order E1609 accepted the EPA for filing pursuant to section  71 of the Utilities Commission Act.  The EPA identified an Annual Generator Baseline (“GBL”) for the Tembec  plant for the term of the contract.  Three of the Bioenergy Call Phase 1 EPAs that BC Hydro filed on February 17 2009 also had Annual GBLs.  Alsodocumentation related to the Clean Power Call indicates that a GBL may be  required where the customer has a generator that is or has been selfgenerating electricity   Commission Order G3801 dated April 52001 directed that Rate Schedule 1821 customers with idle self generation could sell excess selfgenerated electricityprovided that the customer did not arbitrage between  embedded cost utility service and market prices and BC Hydro was not required to supply increased embedded  cost of service power to the customer.  The Commission expected BC Hydro and the customer to agree on a  GBLbased either on the historical energy consumption of the customer or the historical output of the  generator.  Order G1702 continued the conditions of Order G3801 until the Commission determines  otherwise.  The concepts expressed in Order G3801 in the context of near term power sales are now being  applied to longer term EPAs   The Ministry of EnergyMines and Petroleum Resources addressed this matter in its Final Argument dated  January 232009 in the proceeding for the BC Hydro application to amend the Rate Schedule 3808 Power  Purchase Agreement (“RS 3808 PPA”) with FortisBC Inc.  The Ministry stated that the Heritage Contract  established by Heritage Special Direction NoHC2 provides that BC Hydros ratepayers collectively receive the  benefits of the Heritage low cost generation assets of BC Hydro.  The Ministry concluded “While it is appropriate  for selfgenerating customers to sell to market electricity that is in excess of loadconsistent with Commission  Orders G3801 and G1702it is not appropriate for customers to profit by arbitraging between low cost  heritage energy and market prices.”     …/2 
    2      The Commission responded to the application to amend the RS 3808 PPA by Order G4809.  On October 5 2009BC Hydro filed a report in compliance with Section 6.2 of the Decision accompanying Order G4809which  describes how BC Hydro determines a GBL on a case by case basis for each customer with selfgeneration who  sells power   The Commission notes that BC Hydro has developed Guidelines to determine a Customer Baseline Load (“CBL”)  for Rate Schedules 1823 and 1825.  The CBL Guidelines are filed as Electric Tariff Supplement No74   The Commission believes that it may be helpful and timely to develop guidelines for the establishment of GBLs to assist efficiency and consistency in the determination and review of GBLs.  Thereforethe Commission  requests that as part of its next major EPA filing that involves GBLs or next Long Term Acquisition Plan filingBC  Hydro include draft Guidelines for the determination of GBLs.  Attachment A to this letter identifies several  questions related to the determination of GBLsand the Commission requests that BC Hydro address these  questions when it submits the draft GBL Guidelines and related discussion.       Yours truly     Original signed by     Constance MSmith    for Erica MHamilton    JBW/cms  Enclosure    cc MrDennis Swanson  DirectorRegulatory Affairs  Regulatory Affairs Department  FortisBC Inc     BC Hydro 2008 LTAP Intervenors    BC Hydro F2009/2010 RRA Intervenors    BC Hydro Amend s.2.1 RS3808 Intervenors   
APPENDIX A  to Letter L10609  Page 1 of 2    BRITISH COLUMBIA UTILITIES COMMISSION      British Columbia Hydro and Power Authority  Electricity Purchase Agreements – Generator Baselines    Questions regarding the Determination of Generator Baseline (“GBL”)    1.0 What is the relationship between Annual GBL and Hourly GBL?  Which is derived from the otherand  how is this calculation made   2.0 Please provide definitions of Annual GBLHourly GBL and the terms used to define the relationship  between them   3.0 What are the role and function of Hourly GBLs   4.0 Are “low cost heritage energy” and “embedded cost of service power” essentially the same?  What if  any are the differences between them   5.0 A “netofload” criteria that permits a customer with selfgeneration to sell power to BC Hydro only  when and to the extent that the power is in excess of its hourly load would appear to be the most  straight forward criterion to monitor – what are the pros and cons of a “netofload” criterion   6.0 When does BC Hydro base the GBL on the historical energy consumption of the customerIs this the  customers current Customer Baseline LoadIf nothow and over what time period is the historical  consumption determined   7.0 When does BC Hydro base the GBL on the historical output of the customers generatorWhat time  period is used to define the historical output of the generator   8.0 How is the calculation of the GBL affected if the customer has modified the capacity of its generatoror  has commissioned/decommissioned generationDoes it matter whether the change to the customers  generation occurred before or after the Heritage Contract came into effect in 2002   9.0 What is the effect on the GBL calculation if the customer installs a new generator and maintains the old  generator in a backup role?  Are there any “be able to run”, minimum run time per yearor other criteria  that determines that the old generator is properly considered to be backup   10.0 Where an old generator and a new generator both exist at a facilityboth generators predate Special  direction No.  HC2and no GBL has been established previouslywould a “netofload criterion apply?   Please explain why or why not   11.0 If the two bases for GBL in Order G3801 give different resultshow does BC Hydro determine which  GBL to use?     12.0 Once a GBL is agreed uponhow long does it stay in effect   13.0 What would cause a GBL to changeand how would such a change be initiated and implemented  
APPENDIX A  to Letter L10609  Page 2 of 2        14.0 When an EPA expires and the customer wishes to contract its excess power under a new EPAis the GBL  reevaluatedIf yes please explain the basis for the new GBLIf noplease explain why not.     15.0 When an EPA with a GBL expiresshould the customers GBL be retiredand a new GBL calculated using  a “netofload” criterion if the customer wishes to enter into a new EPA   16.0 How is the GBL established for a new customer with selfgeneration that wishes to sell power to BC  Hydro?  If the new customer would not be subject to a “netofload” criterionplease explain why not   17.0 Where BC Hydro buys power from an industrial customer with selfgeneration that is outside the BC  Hydro service area (e.gfrom a customer of FortisBC Inc.), how is the historical GBL established   18.0 Does BC Hydro plan to retire the historical GBL conceptand to replace it with a “netofload” criterion?   If sowhen   19.0 Under the historical GBL conceptdoes BC Hydro consider that it is supplying embedded cost utility  service while purchasing selfgenerated electricity from the same customer at market prices?  Why or  why not   20.0 Please provide examples and diagrams showing how heritage energy is not supplied to a customer while  BC Hydro is also purchasing electricity from the customer at market prices under an EPA that has a GBL.   Please include the cash flows between parties for a Rate Schedule 1823 customerand also provide the  cash flows for an alternative scenario where the customer pays the Tier 2 rate for all power purchased          
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.