LETTER NO. L‐101‐09 SIXTH FLOOR, 900 HOWE STREET, BOX 250 ERICA M. HAMILTON VANCOUVER, B.C. CANADA V6Z 2N3 COMMISSION SECRETARY TELEPHONE: (604) 660‐4700 Commission.Secretary@bcuc.com BC TOLL FREE: 1‐800‐663‐1385 web site: http://www.bcuc.com FACSIMILE: (604) 660‐1102 Log No. 31535 VIA EMAIL bchydroregulatorygroup@bchydro.com November 16, 2009 Ms. Joanna Sofield Chief Regulatory Officer British Columbia Hydro and Power Authority 17 th Floor, 333 Dunsmuir Street Vancouver, B.C. V6B 5R3 Dear Ms. Sofield: Re: British Columbia Hydro and Power Authority Request to Amend Directive 31 of the ______2008 Long‐Term Acquisition Plan Decision_____ The Commission Panel has reviewed the letter dated November 12, 2009 requesting a revised filing date of March 31, 2010 for the guidelines regarding Major Threshold Projects from the originally anticipated January 27, 2010 date for filing. The Commission Panel has determined that British Columbia Hydro and Power Authority’s plan to distribute and discuss a draft set of guidelines with Intervenors and commission staff starting in January and its request to revise the filing date of the guidelines to March 31, 2010 be accepted. Yours truly, Original signed by: for: Erica Hamilton EC/yl cc: Registered Intervenors (Via Email: BCH‐2008 LTAP‐RI) BCH2008LTAPRecon/GenCor/L‐101‐09_Directive 31 of Decision
You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.