                                          SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3   CANADA  web sitehttp://www.bcuc.com  IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473  and  British Columbia Hydro and Power Authority  Large General Service Rate Application  BEFORE AARhodesCommissioner    MRHarleCommissioner    RJMilbourneCommissioner    O  R  D  E  R    WHEREAS   A. On October 262007the British Columbia Utilities Commission (the “Commission”) issued its Decision on  British Columbia Hydro and Power Authoritys 2007 Rate Design Application (“2007 RDA”).  Directive 19 of  the Decisionin partinstructed British Columbia Hydro and Power Authority (“BC Hydro”) to commence  meaningful stakeholder engagement with its Large General Service (“LGS”) customers to develop and file  with the Commission an application for a rate structure or structures that encourage conservation without  unduly benefiting or harming any of its customers in that classand    B. On October 162009BC Hydro filed its LGS Rate Application (“Application”) under sections 5861 of the  Utilities Commission Act seeking orders approving the establishment of new energy rates for customers who  take service under Rate Schedules (“RS”) 1200120112101211 – General Service (35 kW and Over referred to as its Existing Large General Service (“ELGS”) customersand consequential reliefand    C. BC Hydro is seeking to have the ELGS accounts split into two new rates classes which BC Hydro refers to as  the Medium General Service (“MGS”) class and the Large General Service (“LGS”) class.  The specific orders  that BC Hydro seeksincluding the form of the new MGS and LGS rate schedules and consequential changes  required to BC Hydros Electric Tariffare included as Appendix S of the Applicationand          BRIT I SH  COLU   MBIA   UTIL IT I ES  COMM   I S S ION             ORDER       NUMBER   G   15609          TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102        December 102009  . . . /2 
      2  D. By Order G12509 dated October 192009the Commission Panel established a Workshop on November 6 2009a Procedural Conference on December 82009and a Preliminary Regulatory Timetable  that allowed  for two rounds of Information Requests to BC Hydrothe filing of Intervenor Evidence if anyand  Information Requests on Intervenor Evidenceand    E. At the Procedural Conference on December 82009Registered Intervenors made submissions on their  intention to file evidence and all Parties made submissions on the Commission staff proposed alternative  timetables and the type of process to be undertaken for the review of the Applicationand    F. The Commission has considered the submissions of all Parties and has concluded that the regulatory review  of the Application should proceed as an Oral Public Hearing     NOW THEREFORE the Commission orders for the Reasons attached as Appendix A to this Orderas follows   1 Commission Order G12509 is varied to amend the date for the delivery of Commission and Intervenor  Information Request No2 to BC Hydro from ThursdayDecember 17 to MondayDecember 212009   2. The Revised Regulatory Timetable is attached as Appendix B to this Order   3. The Oral Public Hearing will commence on MondayMarch 292010 at 9:00 a.mat the Commission  Hearing RoomTwelfth Floor1125 Howe StreetVancouverBCV6Z 2K8     DATED at the City of Vancouverin the Province of British Columbiathis         10             Attachments      ORDERS/G15609_BCH LGS Rate_RegTimetableReasons     BRIT I SH  COLUMBIA   UTIL IT I ES  COMMISS ION             ORDER       NUMBER   G15609        th                day of December 2009 BY ORDER  Original signed by A.ARhodes  Panel Chair 
                      SIXTH FLOOR900 HOWE STREETBOX 250  VANCOUVERB.C.  V6Z 2N3    CANADA  web sitehttp://www.bcuc.com      An Application by British Columbia Hydro and Power Authority  for Large General Service Rate    Regulatory Timetable      ACTION  Commission and Intervenor Information Request No2    BC Hydro Responses to Information Request No2  Intervenor Evidence (if anyfiled  CommissionBC Hydro and Intervenor Information Request No1  on Intervenor Evidence    Intervenor Responses to Information Request No1  PreHearing Conference (if required Oral Hearing Commences               APPENDIX A  to Order  G15609  Page 1 of 1        TELEPHONE:  (604)  6604700  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102                DATE (2009 MondayDecember 21 DATE (2010 FridayJanuary 22 MondayFebruary 1 WednesdayFebruary 10 TuesdayMarch 2 WednesdayMarch 10 MondayMarch 29
            APPENDIX B  to Order G15609  Page 1 of 3        An Application by British Columbia Hydro and Power Authority  for Large General Service Rate  Regulatory Review Process and Timetable    REASONS FOR DECISION        BACKGROUND    British Columbia Hydro and Power Authority (“BC Hydro”) filed its Application on October 162009 for orders  establishing new energy rates for those of its customers who currently take or would take service under four  different rate schedules relating to large general electricity service.  In the ApplicationBC Hydro proposes to  divide the existing large general rate class into two groups:  large general service (“LGS”) and medium general  service (“MGS”).  It seeks to revise the rate designs and tariffs applicable to those groups   Following receipt of the Applicationthe Commission issued Order G12509 which establishedamong other  thingsa preliminary regulatory timetableincluding dates for two rounds of Information Requests (“IRsand a  Procedural Conference to consider the regulatory process going forward   The Procedural Conference was held on December 92009.  Nine Intervenors were represented and made  submissions at the Procedural Conference.  In addition to BC Hydro providing an outline of the Applicationthe  following issues were canvassed   1 The Nature of the Regulatory Process  2 Whether Intervenors intended to call evidence 3. The Regulatory Timetable    PROCESS    The Commission Panel has considered the submissions received and has decided that an Oral Public Hearing  should be held to review this Application and thatfor the purposes of regulatory efficiencythat process should  be confirmed at this timeto allow all parties to focus their efforts to that end   Although BC Hydro indicated that it prefers a Negotiated Settlement Process (“NSP”) where possibleit also  noted that that process is only useful where all the parties are willing to engage in “without prejudice”  discussions in an attempt to accommodate one another to come to an appropriate settlement.  BC Hydro also  noted that an Oral Hearing process consumes considerable preparation time    
  APPENDIX B  to Order G15609  Page 2 of 3    BC Hydro proposed to delay any decision on process until after a second procedural conference following the  second round of IRs and the filing of Intervenor evidenceunless all parties indicated that they were in favour of  attempting resolution through an NSP at this Procedural Conference.  This position was adopted by a number of  Intervenors   The Commercial Energy Consumers Association of British Columbia(“CEC”) ( also working with Coast Forest  Products Associationstated that it thought an NSP process might resolve some issuesbut also submitted that given the serious issues contained in the filingresort should be had to an oral hearing process on any issues  which could not be resolved through an NSP   The Terasen UtilitiesPinnacle Pellet Incand BC Ferries Corporation also supported the NSP process   The Joint Industry Electricity Steering Committee favoured an NSP before any processwhether written or oral  and submitted that it was premature to determine the ultimate process at this stage   The BC Old Age Pensioners’ Organization (“BCOAPO”) et alexpressed skepticism at the concepts of both a  written hearing and an NSP given the complexity of the issues and the dynamics of a settlement process where  one partys interests are quite different from those of the rest of the group   Corix Multi Services Utility Inc. (“Corix”) also submitted that an NSP process would be “very challenging” in the  circumstances   Commission Panel Determination    The Commission Panel agrees with BCOAPO and Corix that the issues raised in the Application are complex and  that an Oral Public Hearing process is best suited to resolve such issues.  The Commission Panel notes that the  Application arises from the rejection by the Commission of the proposal made by BC Hydro in the 2007 RDA  which was reviewed by way of an Oral Public Hearingand that the current large general service rate design has  not had the benefit of the full scrutiny of the Commission which attaches to an Oral Public Hearing process   There are also additional issues arising from the stated “Governments Energy Objectives “whichin the Panels  viewcan only be fully canvassed by way of an Oral Public Hearing.  Although the Panel acknowledges the  potential cost savings associated with an NSPthat process is only a tool which can be used to complement the  traditional regulatory process.  In this casethe complexity of the issues and the lack of a recent oral hearing to  consider themmilitates against an NSP in favour of an oral hearing   Accordinglygiven these viewsthe Commission Panel finds that there is no benefit to deferring the decision as  to the review process to a further procedural conferenceThe Application will be reviewed by way of an Oral  Public Hearing commencing March 292010  
            APPENDIX B  to Order G15609  Page 3 of 3        DATE FOR FILING SECOND ROUND OF INFORMATION REQUESTS TO BC HYDRO    The CEC also requested that the date for filing the second round of IRs be moved to January 52010 from  December 172009 to allow more time for the Intervenor groups to analyze BC Hydros extensive responses to  the first round of IRswhich were provided on December 72009.  A number of Intervenors supportedand no  Intervenor opposedthis position   BC Hydro observed that such an extensionwhen coupled with constraints which will be imposed by the Olympic  Gameswould amount to a six week extension.  BC Hydro opposed such an extension in the absence of an  extension to the other relevant dates in the timetable   Commission Panel Determination    The Commission Panel accepts BC Hydros position that the 19 day extension requested (from December 17 2009 to January 52010would bring other timetable constraints imposed by the Olympic Games into play.  The  Commission Panel also acknowledges that under the current timetable there is a relatively short time for the  Intervenors to consider the extensive record now in place as a result of the first round of IRs.  The Commission  Panel is cognizant of the fact thatalthoughas counsel for BC Hydro noted, “the lights wont go off” if the  matter is delayedthere are other applications pending which will also involve many of the parties and there is a  need to have the rate design finalized without undue delay given the Provinces energy objectives   Accordinglythe Commission Panel therefore directs that the second round of IRs to BC Hydro be provided on or  before December 212009.  This allows additional time for the Intervenors to prepare their questions and leaves  the remaining timetable intact   Order G12509 is to be amended to reflect an Oral Public Hearing commencing on March 292010and a  change in the date for the filing of Information Request No2 to BC Hydro from December 172009 to  December 212009.  The remaining relevant dates in Order G12509 remain unchangedall as set out in the  Revised Regulatory Timetable attached to Order G15609  
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.