                              BRIT I SH  COLUMBIA     UTIL IT I ES  COMMISS ION                   ORDER       NUMBER   G15909            SIXTH FLOOR900 HOWE STREETBOX 250  TELEPHONE:  (604)  6604700  VANCOUVERB.C.  V6Z 2N3   CANADA  BC TOLL FREE:  18006631385  web sitehttp://www.bcuc.com  FACSIMILE:  (604)  6601102    IN THE MATTER OF  the Utilities Commission ActR.S.B.C1996Chapter 473    and    An Application by British Columbia Transmission Corporation  for a Certificate of Public Convenience and Necessity  for the Vancouver City Central Transmission Project      BEFORE A.ARhodesCommissioner/Panel Chair  L.AOHaraCommissioner   December 162009    A.JPullmanCommissioner  O  R  D  E  R    WHEREAS   A On September 212009the British Columbia Transmission Corporation ("BCTC") applied (the  Application”), pursuant to sections 45 and 46 of the Utilities Commission Act (the “Act”), to the  Commission for a Certificate of Public Convenience and Necessity (“CPCN”) to construct and operate the  Vancouver City Central Transmission Project (the “VCCT Project”) as described in this Applicationand    B BCTC is proposing the VCCT Project as the preferred solution toiserve load growth in the Mount  Pleasant/South False Creek areaiiresolve reliability concerns associated with the end of life condition of  the Main Street distribution duct banks being used to serve the Mount Pleasant/South False Creek area and iiiresolve reliability concerns in view of the zerorating of transmission circuit 2L53and    C The VCCT Project as originally filedhad an estimated capital cost of approximately $174 million and a  further $27 million to be incurred for British Columbia Hydro and Power Authoritys Substation Distribution  Assets (“SDA”) which were not at that time the subject of the Applicationand included the construction of  a new Mount Pleasant substation and a new transmission line approximately 8 km in length that follows the  route described in the Application as Route Option Band    D In the F2010/2011 BCTC Capital Plan Decisiondated July 132009the Commission directed BCTC to work  with BC Hydro to either accept its proposal to have BCTC or BC Hydro seek regulatory approval for the  entire projectincluding both transmission and SDA componentsor develop an alternative approach and  directed BCTC and BC Hydro to provide their report within 90 days from the date of Decisionand    E On October 212009BCTC filed amendments to its Application to incorporate an application for an order  issuing a CPCN to BC Hydro for the construction and operation of the VCCT Substation Distribution Assets and 
        BRIT ISH  COLUMBIA     UTIL IT IES  COMMISS ION               ORDER      NUMBER   G15909      2          F On WednesdayNovember 252009the Commission held a Procedural Conference to hear submissions on  the appropriate regulatory process for the review of the Applicationand    G.   The Commission has considered all submissions on the appropriate regulatory process for the review of the  Application and concludes that a written public hearing process for the review of the Application would be  in the public interest     NOW THEREFORE the Commission orders as follows   1.   The Commission amends the written public hearing process for the review of the Applicationin  accordance with the Amended Regulatory Timetable attached as Appendix A to this Order.      2 Intervenors intending to apply for participant assistance must submit a budget estimate consistent with the  Commissions Participant Assistance/Cost Award Guidelines and Order G7207 by the date as set out in  Appendix A to this Order.  Copies of the Commissions Participant Assistance/Cost Award Guidelines and  Order G7207are available upon request or can be downloaded from the Commissions web site at  http://www.bcuc.com     DATED at the City of Vancouverin the Province of British Columbiathis      16 th              day of December 2009     BY ORDER      Original signed by     A.ARhodes    Commissioner  Attachments    Orders/G15909_BCTCVCCT_Amended_RegulatoryTimetable 
APPENDIX A  to Order G15909  Page 1 of 1        An Application by British Columbia Transmission Corporation  for a Certificate of Public Convenience and Necessity  for the Vancouver City Central Transmission Project        AMENDED REGULATORY TIMETABLE        ACTION  DATE (2010 Submission of Intervenor Evidence    FridayJanuary 152010 Intervenor Participant Assistance Budgets  ThursdayJanuary 212010 CommissionApplicant and Intervenor Information Requests on  FridayJanuary 222010 Intervenor Evidence   Commission Information Request No2 and Intervenor Information  FridayJanuary 292010 Request No1 to BCTC    Response to Information Requests on Intervenor Evidence  FridayFebruary 52010 BCTC Response to Intervenor  Information Request No1and  ThursdayFebruary 112010 Commission Information Request No2  Rebuttal Evidence (if required FridayMarch 5,2010 BCTC  written Final Submissions  FridayMarch 122010 Intervenors  written Final Submissions   FridayMarch 262010 BCTC written Reply Submissions  ThursdayApril 12010      
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.