                  LETTER L9909                ERICA MHAMILTON  SIXTH FLOOR900 HOWE STREETBOX 250  COMMISSION SECRETARY  VANCOUVERB.C.  CANADA  V6Z 2N3  Commission.Secretary@bcuc.com  TELEPHONE:  (604)  6604700  web sitehttp://www.bcuc.com  BC TOLL FREE:  18006631385  FACSIMILE:  (604)  6601102  Log No30250  VIA EMAIL  dennis.swanson@fortisBC.com regulatory@fortisbc.com  November 32009        MrDennis Swanson  DirectorRegulatory Affairs  FortisBC Inc 1001975 Springfield Road  KelownaBC   V1Y 7V7    Dear MrSwanson   Re:  British Columbia Hydro and Power Authority  Application to Amend  Section 2.1 of Rate Schedule 3808 – Order G4809    In Order G4809the Commission requested that FortisBC Inc. (“FortisBC”) file as informationits current  intentions as to whether it would be implementing an Open Access SameTime Information System (“OASIS”) for  its transmission transactions.  The Commissions request was stimulated in part by BC Hydros submission in the  proceeding that the Commission should consider requiring FortisBC to implement an OASIS for its transmission  transactionsor in the alternativeto provide relevant information on its website. (See Decision at p34   Fortis BC replied to the Commissions request on August 42009 and the reply was forwarded to BC Hydro for  comments under cover of the Commissions letter of August 242009.  BC Hydro provided comments in its letter  of September 22009 and FortisBC responded in its letter to the Commission of September 92009   The Commission Panel has reviewed the correspondence and has decided that in the present circumstances there is no need for FortisBC to establish an Open Access SameTime Information System for its limited  transmission transactions   Howeverthe Panel does agree with the submission in the BC Hydro letter of September 22009that the  purpose of an OASIS goes further than the limited purpose of managing potential transmission congestion on  constrained paths.  BC Hydro has set out the objectives of an OASIS as they were put forward by the Federal  Energy Regulatory Commission (“FERC”) in its Notice of Proposed Rulemaking60 FR 66182.  While FERC rulings  or definitions are not binding upon the Commission or public utilities regulated in BC under the provisions of the  Utilities Commission ActRSBC 1996Chapter 473international comity and crossborder reciprocity has led to  standardized operational standards and protocols.  The Panel agrees with BC Hydros characterization of the  purpose to be served by an OASIS as “… to provide transparency of transmission transactions to all transmission  customers who useor may usethe system.” …/2 
    LETTER L9909    2        The Panel is of the view that the limited current transmission services offered by FortisBCdo not warrant the  cost of implementing a standalone OASIS.  FurtherFortisBC in its reply response of September 92009  undertook to enhance its public website to better inform its transmission customers and other interested  parties.  It will post information as follows   Description of the transmission system Transmission TariffTerms and Conditions Interconnection Guidelines Process for applying for transmission serviceand  List of existing users and their use of the transmission system   These website postings should meet the requirements put forward as a suggestion by BC Hydro   AlsoFortisBC noted in its reply response that while energy schedules through FortisBCs system are not tagged there is no pressing need for an etag system because there is at present only one customer for transmission  services and any problem (such as a required curtailmentcan be corrected manually by realtime staff.  FortisBC  further notes that in the six years since the Kootenay Intertie went into servicethere has not been a required  curtailment   FinallyFortisBC offers to report annually on third party transmission usage and to comment on the need to  considerif then current conditions warrantthe implementation of an OASIS.  The Panel accepts this offer and  looks forward to reviewing these reports andas appropriateseeking comments from users and the wider  public   It may well be the case that as new Independent Power Producers (“IPPs”) come on streamthere will be  increased need for transmission services within the operating territory of FortisBCfurtherthere are  proceedings now before the Commission (e.gthe Waneta Transaction and the operation and use of  transmission line L71that may trigger the need for increased surveillance and monitoring of the FortisBC  transmission facilities and services.  In the absence of an operating OASISthe dispute resolution procedures of  the Commission are available to any interested parties     Yours truly     Original signed by     Alison Cormack    For Erica MHamilton  PV/ac  cc MsJoanna Sofield    Chief Regulatory Officer    British Columbia Hydro and Power Authority    (bchydroregulatorygroup@bchydro.com   FortisBC/Cor/BCH Amend Section 2.1 – L9909 to FortisBC   
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.