Orders

Decision Information

Decision Content

Via Email

bchydroregulatorygroup@bchydro.com                                               December 23, 2010

RBC@bht.com

tappvale@shuswap.net

 

 

Ms. Joanna Sofield

Chief Regulatory Officer

British Columbia Hydro and Power Authority

333 Dunsmuir Street

Vancouver, BC   V6B 5R3

Mr. Bill Kennedy

Tappenvale Farm

705 Tappen Valley Road

Tappen, BC   V6B 5R3

Mr. R. Brian Wallace

Bull, Housser & Tupper LLP

3000 Royal Centre

PO Box 11130

1055 West Georgia Street

Vancouver, BC   V6E 3R3

 

Dear Ms. Sofield, Mr. Kennedy and Mr. Wallace:

 

Re:  British Columbia Hydro and Power Authority

Tappenvale Farm Stray Voltage Complaint

 

By email dated March 29, 2007, Mr. Bill Kennedy of Tappenvale Farm requested information from the British Columbia Utilities Commission (the Commission) about allowable levels of voltage on electrical power neutral lines.  This inquiry developed into the Tappenvale Farm stray voltage complaint (the Complaint).

 

British Columbia Hydro and Power Authority (BC Hydro) filed the Kinectrics Inc. (Kinectrics) report dated June 16, 2010 under an Action Plan requested by the Commission, and on December 17, 2010 filed the signed form of a supplementary Kinectrics report dated November 18, 2010.  Further to letters from BC Hydro and Mr. Wallace dated December 22, 2010, the Commission establishes a written comment process for the Complaint and the Regulatory Timetable that is set out in Appendix A of this Letter.

 

Mr. Wallace proposes that the scope of the Information Requests should include related BC Hydro operational activities and its knowledge of matters related to Tappenvale Farm.  Mr. Wallace submits that limiting the Information Requests to the two Kinectrics reports, as BC Hydro proposes, would unfairly redefine and limit the Complaint.  The Kinectrics testing was carried out and the two reports were prepared in accordance with the BC Hydro Action Plan that the Commission accepted, and therefore the Commission expects that Information Requests will focus mainly on these reports.  Nevertheless, in order to comprehensively address the Complaint, the scope of Information Requests to BC Hydro may include related BC Hydro operational activities and its knowledge of matters related to Tappenvale Form, as long as the questions are relevant to the Complaint.

 

A very large amount of correspondence has been exchanged related to the Complaint; much of the correspondence has been informal and often it was related to the changes that have been made to the electrical systems of Tappenvale Farm and BC Hydro in attempts to improve the situation.  In order to focus on the


 

current situation, the Commission establishes the Preliminary Exhibit List for the Tappenvale Farm Complaint as set out in Appendix B to this Letter.  If Tappenvale Farm or BC Hydro wishes to add additional past correspondence or documents to the Exhibit List, they should apply to do so by Wednesday, January 12, 2011.  For clarity, this refers to the filing of old documentation related to the Complaint, and not to Written Evidence that Tappenvale Farm may wish to file by February 10, 2011.

 

                                                                                                                                  Yours truly,

 

 

 

                                                                                                                                  Erica M. Hamilton

JBW/yl

Enclosures

cc:           Mr. Fred James

                British Columbia Hydro and Power Authority

                (Fred.James@bchydro.com)

 


 

British Columbia Hydro and Power Authority

Tappenvale Farm Stray Voltage Complaint

 

 

 

Regulatory Timetable

 

 

 

Action

Date (2011)

Information Requests to BC Hydro

Wednesday, January 5

Applications to include other documents

Wednesday, January 12

BC Hydro responds to Information Requests

Wednesday January 26

Tappenvale Farm files Written Evidence

Thursday, February 10

Information Requests to Tappenvale Farm

Friday, February 18

Tappenvale Farm responds to Information Requests

Friday, March 11

Tappenvale Farm Final Submission on Complaint

Friday, March 25

BC Hydro Final Submission on Complaint

Friday, April 8

Tappenvale Farm Reply Submission

Friday, April 15

 

 


 

British Columbia Hydro and Power Authority

Tappenvale Farm Stray Voltage Complaint

 

 

 

Preliminary Exhibit List

 

 

 

 

Exhibit                                                         Description

1

Email from Mr. Bill Kennedy of Tappenvale Farm to the Commission, dated March 29, 2007

2

Commission letter dated February 17, 2010 requesting an Action Plan

 

3

BC Hydro letter dated March 18, 2010 setting out its Action Plan

4

Commission letter dated March 30, 2010 accepting the Action Plan, with comments

5

BC Hydro letter dated June 24, 2010 attaching Kinectrics Inc. Report dated June 16, 2010

6

Commission letter dated September 22, 2010 attaching Dr. Gustafson’s September 20, 2010 peer review of the Kinectrics Report dated June 16, 2010

 

7

BC Hydro letter dated December 17, 2010 attaching a signed copy of the Kinectrics Inc. Report dated November 18, 2010

 

 

 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.