Orders

Decision Information

Decision Content

BRITI SH COLUM BI A UTIL I T IE S COMMI SSIO N OR DER NUMBER G-167-10 SIXTH FLOOR, 900 HOWE STREET, BOX 250 VANCOUVER, BC V6Z 2N3 CANADA TELEPHONE: (604) 660-4700 web site: http://www.bcuc.com BC TOLL FREE: 1-800-663-1385 FACSIMILE: (604) 660-1102 IN THE MATTER OF the Utilities Commission Act, R.S.B.C. 1996, Chapter 473 and An Assessment Report No. 2 by the British Columbia Transmission Corporation and the Determination of Reliability Standards for Adoption in British Columbia BEFORE: A.A. Rhodes, Commissioner L.A. OHara, Commissioner November 10, 2010 O R D E R WHEREAS: A. Pursuant to section 125.2(2) of the Utilities Commission Act (the Act) the British Columbia Utilities Commission (the Commission) has exclusive jurisdiction to determine whether a reliability standard,” as defined in the Act, is in the public interest and should be adopted in British Columbia; B. Ministerial Order No. MO39 dated February 22, 2009 made a Mandatory Reliability Standards Regulation (the Mandatory Reliability Standard Regulation) which prescribes the parties that are subject to reliability standards adopted under section 125.2(6) of the Act; C. In order to facilitate the Commission's consideration of reliability standards, the British Columbia Transmission Corporation (BCTC) as it then was, was required under section 125.2(3) of the Act to review each reliability standard and provide the Commission with a report assessing: (a) any adverse impact of the reliability standard on the reliability of electricity transmission in British Columbia if the reliability standard were adopted; (b) the suitability of the reliability standard for British Columbia; (c) the potential cost of the reliability standard if it were adopted; (d) any other matter prescribed by regulation or identified by order of the Commission; D. On February 23, 2010, BCTC filed a report (Assessment Report No. 2) pursuant to section 125.2(3) of the Act assessing one new reliability standard (BAL-004-WECC-01) and revisions to 22 existing reliability standards developed by the North American Electric Reliability Corporation (NERC) and the Western Electricity Coordinating Council (WECC). (The 22 existing reliability standards were adopted in BC June 4, 2009 by the Commission under Order No. G6709); . . . /2
BRITI SH COLUM BI A UTIL I T IE S COMMI SSIO N OR DER NUMBER G-167-10 2 E. Assessment Report No. 2 appended as Appendix B the NERC Glossary of Terms Used in Reliability Standards (NERC Glossary of Terms), dated April 20, 2009, to replace the NERC Glossary of Terms dated February 12, 2008 that were adopted under Order G-67-09; F. Assessment Report No. 2 also appended as Appendix F-1 the NERC Functional Model Version 4 to replace NERC Functional Model Version 3 which was also adopted under Order G-67-09; G. BCTC concluded that the one new reliability standard and the revisions to the 22 existing reliability standards are suitable for adoption in British Columbia; H. Pursuant to section 125.2(5)(a) of the Act, the Commission posted Assessment Report No. 2 on its website at www.bcuc.com and, by Order G-36-10 dated March 4, 2010 directed BCTC to publish a Notice of Assessment Report No. 2 and Process for Public Comments, and established the Regulatory Timetable for comments; I. Comments were received from FortisBC noting agreement with BCTCs assessment; J. On April 21, 2010 BCTC provided comments in response; K. The Commission received no other comments on the reliability standards assessed in Assessment Report No. 2; L. On July 5, 2010 the shares of BCTC were transferred to and vested in British Columbia Hydro and Power Authority (BC Hydro), and BC Hydro became responsible for inter alia the obligations and liabilities of BCTC; M. By letter dated October 4, 2010, WECC recommended that the Commission not adopt Version 4 or any other version of the NERC Functional Model, as it is a technical document that is used as part of the NERC standards development process and it may contain definitions that conflict with existing definitions in the NERC Glossary of Terms; N. The Commission has reviewed and considered Assessment Report No. 2 and the reliability standards assessed in it as well as the comments received and determines that the standards assessed in BCTCs Assessment Report No. 2 are in the public interest and should be adopted in British Columbia to maintain or achieve consistency with other jurisdictions that have adopted the reliability standards, subject to the terms of this Order; O. The Commission considers that the NERC Glossary of Terms dated April 20, 2009 should be adopted and that the adoption of the NERC Functional Model Version 3 should be rescinded; P. The Commission considers that it is appropriate to provide an effective date for entities to come into compliance with the reliability standards to be adopted in this Order; . . . /3
BRITI SH COLUM BI A UTIL I T IE S COMMI SSIO N OR DER NUMBER G-167-10 3 NOW THEREFORE pursuant to section 125.6 of the Act, the Commission orders as follows: 1. The Commission adopts, subject to Directive 8 that follows, BAL004WECC01, to be effective as of January 1, 2011 (the Effective Date). 2. The 22 existing reliability standards listed in the table found in Attachment A to this Order, under the heading, Rescinded Standard,” are rescinded as of the Effective Date. 3. The Commission adopts, subject to Directive 8 that follows, the 22 revised standards listed in the table found in Attachment A under the heading Adopted Revised Standard,” to be effective as of the Effective Date. 4. The Commission adopts the NERC Glossary of Terms Used in Reliability Standards, dated April 20, 2010, which defines terms employed in the reliability standards, and which is posted to the WECC and NERC website, to be effective as of the Effective Date. 5. The Commission declines to adopt the NERC Functional Model, Version 4, and rescinds the adoption of NERC Functional Model, Version 3, previously ordered in item 3 of Order G-67-09, effective as of the date of this Order, and confirms that the NERC Functional Model is of no force and effect in British Columbia. 6. The Commission directs that individual requirements within reliability standards that incorporate by reference reliability standards that have not been adopted by the Commission are of no force or effect. 7. The Commission adopts the Compliance Provisions, as defined in the Rules of Procedure for Reliability Standards in British Columbia, that accompany each of the adopted British Columba reliability standards, in the form directed by the Commission to be posted on the WECC website, as amended from time to time. 8. As a result of this Order and Order G6709, the standards listed in the table found in Attachment B to this Order are the reliability standards adopted in BC as of the Effective Date. DATED at the City of Vancouver, in the Province of British Columbia, this day of 10 th November 2010. BY ORDER Original signed by: A. A. Rhodes Commissioner Attachment Orders/G-167-10_BCTC-MRS Reliability-Assessment Report No. 2
Revised Standards Rescinded Standard Adopted Revised Standard BAL0010a BAL00101a BAL0030a BAL0030.1b BAL0050b BAL0050.1b BAL0061 BAL0061.1 COM0011 COM0011.1 EOP0022 EOP0022.1 FAC0101 FAC0102 FAC0111 FAC0112 FAC0141 FAC0142 IRO0011 IRO0011.1 IRO0051 IRO0052 IRO0063 IRO0064 MOD0060 MOD0060.1 MOD0161 MOD0161.1 MOD0170 MOD0170.1 MOD0190 MOD0190.1 NUC0011 NUC0012 PRC0160 PRC0160.1 TOP0041 TOP0042 TOP0051 TOP0051.1 TPL0010 TPL0010.1 VAR002la VAR0021.1a APPENDIX A to Order G-167-10 Page 1 of 1 Standard Name Real Power Balancing Control Performance Frequency Response and Bias Automatic Generation Control Inadvertent Interchange Telecommunications Capacity and Energy Emergencies System Operating Limits Methodology for the Planning Horizon System Operating Limits Methodology for the Operations Horizon Establish and Communicate System Operating Limits Reliability Coordination Responsibilities and Authorities Reliability Coordination Current Day Operations Reliability Coordination Transmission Loading Relief (TLR) Procedure for the Use of Capacity Benefit Margin Value Documentation of Data Reporting Requirements for Actual and Forecast Demand, Net Energy for Load, and Controllable DemandSide Management Aggregated Actual and Forecast Demands and Net Energy for Load Reporting of Interruptible Demands and Direct Control Load Management Nuclear Plant Interface Coordination Special Protection System Misoperations Transmission Operations Operational Reliability Information System Performance Under Normal (No Contingency) Conditions (Category A) Generator Operation for Maintaining Network Voltage Schedules
Standards in Force in BC as of effective Date (Standards shaded in orange are the standard assessed in BCTCs Assessment Report No. 2.) Standard Standard Name BAL00101a Real Power Balancing Control Performance BAL0020 Disturbance Control Performance BAL0030.1b Frequency Response and Bias BAL0040 Time Error Correction BAL004WECC01 Automatic Time Error Correction BAL0050.1b Automatic Generation Control BAL0061.1 Inadvertent Interchange BALSTD0020 Operating Reserves CIP0011 Sabotage Reporting CIP0021 Cyber Security Critical Cyber Asset Identification CIP0031 Cyber Security Security Management Controls CIP0041 Cyber Security Personnel & Training CIP0051 Cyber Security Electronic Security Perimeter(s) CIP0061 Cyber Security Physical Security of Critical Cyber Assets CIP0071 Cyber Security System Security Management CIP0081 Cyber Security Incident Reporting and Response Planning CIP0091 Cyber Security Recovery Plans for Critical Cyber Assets COM0011.1 Telecommunications COM0022 Communication and Coordination EOP0010 Emergency Operations Planning EOP0022.1 Capacity and Energy Emergencies EOP0031 Load Shedding Plans EOP0041 Disturbance Reporting EOP0051 System Restoration Plans EOP0061 Reliability Coordination System Restoration EOP0080 Plans for Loss of Control Center Functionality APPENDIX B to Order G-167-10 Page 1 of 5 Order Approving G-167-10 G6709 G-167-10 G6709 G-167-10 G-167-10 G167-10 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G-167-10 G6709 G6709 G167-10 G6709 G6709 G6709 G6709 G6709
Standard Standard Name EOP0090 Documentation of Blackstart Generating Unit Test Results FAC0010 Facility Connector Requirements FAC0020 Coordination of Plans For New Generation, Transmission, and EndUser FAC0031 Transmission Vegetation Management Program FAC0081 Facility Ratings Methodology FAC0091 Establish and Communicate Facility Ratings FAC0102 System Operating Limits Methodology for the Planning Horizon FAC0112 System Operating Limits Methodology for the Operations Horizon FAC0131 Establish and Communicate Transfer Capability FAC0142 Establish and Communicate System Operating Limits INT0013 Interchange Information INT0032 Interchange Transaction Implementation INT0042 Dynamic Interchange Transaction Modifications INT0052 Interchange Authority Distributes Arranged Interchange INT0062 Response to Interchange Authority INT0071 Interchange Confirmation INT0082 Interchange Authority Distributes Status INT0091 Implementation of Interchange INT0101 Interchange Coordination Exemptions IRO0011.1 Reliability Coordination Responsibilities and Authorities IRO0021 Reliability Coordination Facilities IRO0032 Reliability Coordination Wide Area View IRO0041 Reliability Coordination Operations Planning IRO0052 Reliability Coordination Current Day Operations IRO0064 Reliability Coordination Transmission Loading Relief (TLR) APPENDIX B to Order G-167-10 Page 2 of 5 Order Approving G6709 G6709 G6709 G6709 G6709 G6709 G-167-10 G-167-10 G6709 G-167-10 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G6709 G-167-10 G6709 G6709 G6709 G-167-10 G-167-10
APPENDIX B to Order G-167-10 Page 3 of 5 Standard Standard Name Order Approving IRO0141 Procedures, Processes, or Plans to Support Coordination G6709 Between Reliability Coordinators IRO0151 Notification and Information Exchange Between Reliability G6709 Coordinators IRO0161 Coordination of Realtime Activities Between Reliability G6709 Coordinators IROSTD0060 Qualified Path Unscheduled Flow Relief G6709 MOD0060.1 Procedure for the Use of Capacity Benefit Margin Value G-167-10 MOD0070 Documentation of the Use of Capacity Benefit Margin G6709 MOO0100 SteadyState Data for Modeling and Simulation of the G6709 Interconnected Transmission System MOD0120 Dynamics Data for Modeling and Simulation of the G6709 Interconnected Transmission System MOD0161.1 Documentation of Data Reporting Requirements for Actual and G-167-10 Forecast Demand, Net Energy for Load, and Controllable DemandSide Management MOD0170.1 Aggregated Actual and Forecast Demands and Net Energy for G-167-10 Load MOD0180 Treatment of Non member Demand Data and How Uncertainties G6709 are Addressed in the Forecasts of Demand and Net Energy for Load MOD0190.1 Reporting of Interruptible Demands and Direct Control Load G-167-10 Management MOD0200 Providing Interruptible Demands and Direct Control Load G6709 Management Data to System Operators and Reliability Coordinators MOD0210 Documentation of the Accounting Methodology for the Effects G6709 of Controllable DemandSide Management in Demand and Energy Forecasts NUC0012 Nuclear Plant Interface Coordination G-167-10 PER0010 Operating Personnel Responsibility and Authority G6709 PER0020 Operating Personnel Training G6709 PER0030 Operating Personnel Credentials G6709 PER0041 Reliability Coordination Staffing G6709
APPENDIX B to Order G-167-10 Page 4 of 5 Standard Standard Name Order Approving PRC0011 System Protection Coordination G6709 PRC0041 Analysis and Mitigation of Transmission and Generation G6709 Protection System Misoperations PRC0051 Transmission and Generation Protection System Maintenance G6709 and Testing PRC0070 Assuring Consistency of Entity Underfrequency Load Shedding G6709 Programs with Regional Reliability Organizations Underfrequency Load Shedding Program Requirements PRC0080 Implementation and Documentation of Underfrequency Load G6709 Shedding Equipment Maintenance Program PRC0090 Analysis and Documentation of Underfrequence Load Shedding G6709 Performance Following and Underfrequency Event PRC0100 Technical Assessment of the Design and Effectiveness of G6709 Undervoltage Load Shedding Program PRC0110 Undervoltage Load Shedding System Maintenance and Testing G6709 PRC0150 Special Protection System Data and Documentation G6709 PRC0160.1 Special Protection System Misoperations G-167-10 PRC0170 Special Protection System Maintenance and Testing G6709 PRC0181 Disturbance Monitoring Equipment Installation and Data G6709 Reporting PRC0211 Under Voltage Load Shedding Program Data G6709 PRC0221 UnderVoltage Load Shedding Program Performance G6709 PRCSTD0011 Certification of Protective Relay Applications and Settings G6709 PRCSTD0031 Protective Relay and Remedial Action Scheme Misoperation G6709 PRCSTD005l Transmission Maintenance G6709 TOP0011 Reliability Responsibilities and Authorities G6709 TOP0022 Normal Operations Planning G6709 TOP0030 Planned Outage Coordination G6709 TOP0042 Transmission Operations G-167-10
Standard Standard Name TOP0051.1 Operational Reliability Information TOP0061 Monitoring System Conditions TOP0070 Reporting System Operating Unit (SOL) and Interconnection Reliability Operating Limit (IROL) Violations -TOP0081 Response to Transmission Unit Violations TOPSTD0070 Operating Transfer Capability TPL0010.1 System Performance Under Normal (No Contingency) Conditions (Category A) TPL0020 System Performance Following Loss of a Single Bulk Electric System Element (Category B) TPL0030 System Performance Following Loss of Two or More Bulk Electric System Element (Category C) TPL0040 System Performance Following Extreme Events Resulting in the Loss of Two or More Bulk Electric System Element (Category D) VAR0011 Voltage and Reactive Control VAR0021.1a Generator Operation for Maintaining Network Voltage Schedules VARSTD002a1 Automatic Voltage Regulators VARSTD002b1 Power System Stabilizer APPENDIX B to Order G-167-10 Page 5 of 5 Order Approving G-167-10 G6709 G6709 G6709 G6709 G-167-10 G6709 G6709 G6709 G6709 G-167-10 G6709 G6709
 You are being directed to the most recent version of the statute which may not be the version considered at the time of the judgment.